Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›Electric Utility Relocation Project at Cerritos Ave and…

The City of Anaheim·California

Electric Utility Relocation Project at Cerritos Ave and Douglas Rd

Closes 12/15/2025$1M – $5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Anaheim is soliciting bids for the construction of an Electric Utility Relocation Project. The project involves the removal of existing 12 kV overhead electrical distribution facilities and the installation of new underground substructures and associated equipment. The project is located at Cerritos Avenue and Douglas Road, in coordination with the OCVIBE! development. The contractor will be responsible for protecting existing public improvements, replacing damaged public improvements, and maintaining minimum separations from existing water facilities and sewer/storm drain facilities. The contractor will also be required to provide and install new duct banks, conduits, and substructures, and to make connections and energize service equipment as shown. The key elements of the project include: • Removing existing 12 kV overhead electrical distribution facilities • Installing new underground substructures and associated equipment • Protecting existing public improvements and replacing damaged public improvements • Maintaining minimum separations from existing water facilities and sewer/storm drain facilities • Providing and installing new duct banks, conduits, and substructures • Making connections and energizing service equipment as shown The project requires the contractor to have experience with electric utility relocation and to be familiar with the City of Anaheim's construction standards and specifications. The contractor will be required to coordinate with the City's engineering and inspection staff to ensure that the project is completed in accordance with the plans and specifications.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

John Martin(Customer, Electric Inspector, Electric Engineering)

[email protected]

(714) 765-5157

Key dates

Opened
11/11/2025
Questions due
12/3/2025
Pre-bid meeting
11/17/2025
Closes
12/15/2025
Duration
240 working days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237990
Solicitation №
RCP2024-22370

Budget estimate

$1,000,000 – $5,000,000

Based on the project description, the budget for this project is estimated to be between $1 million and $5 million. This estimate is based on the scope of work, which includes the removal of existing 12 kV overhead electrical distribution facilities and the installation of new underground substructures and associated equipment. The actual budget may vary depending on the complexity of the project, the materials and labor required, and the contractor's bid.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Georgia City of Elberton·Georgia

Top match · 69%

Electric Capital Improvement Project South Oliver Line Rehabilitation Project

Closes 12/2/2026Opened 10/23/2026

City of Cedar Rapids·Iowa

68% match

2nd Street SE Relocation of Interior Vault Utilities

Closes 11/18/2026Opened 10/21/2026

California Department of Transportation·California

68% match

Install capture housing, landscape, and electrical.

Closes 11/4/2026Opened 9/28/2026

City of Watsonville·California

68% match

River Park Electrical Relocation

Closes 11/5/2026Opened 10/5/2026

Lucas County, OH Facility Management·Ohio

67% match

CIP 26-011 EMS Generator

Closes 11/12/2026Opened 10/9/2026

Brazos Valley·Texas

67% match

G&A Building Backup Generator Improvements

Closes 11/13/2026Opened 10/16/2026

City of Toledo·Ohio

67% match

Douglas Road Roadway Reconstruction

Closes 11/24/2026Opened 10/30/2026

City of Gallup·New Mexico

66% match

Turnkey-Engineering, Procurement and Construction (EPC) for New Carbon Coal Electrical Substation

Closes 11/6/2026Opened 7/24/2026

Hastings Utilities·Nebraska

66% match

Water Main Relocation St Joseph Ave from 7th to 8th Street HU 2026-43

Rolling / TBD closeOpened 5/4/2026

California Department of General Services·California

66% match

CONTRACT:26-337609; DSH ATASCADERO ELECTRICAL UPGRADES; DEPARTMENT OF STATE HOSPITALS; ATASCADERO, SAN LUIS OBISPO COUNTY, CALIFORNIA; PROJECT:142452A

Closes 11/18/2026Opened 10/9/2026

City of Cerritos·California

66% match

CDBG-Funded curb ramp/sidewalk repairs at Cerritos Towne Center Phase IV (CDBG Project No. 602800-26), Project No. 24302

Closes 11/18/2026Opened 10/23/2026

City of Fort Myers·Florida

66% match

Michigan Avenue Utility Improvement Project

Closes 11/3/2026Opened 9/24/2026

Village of Wellington·Florida

66% match

Water Reclamation Facility Solids Control Room Relocation Project.

Closes 11/12/2026Opened 9/29/2026

City of Long Beach·California

66% match

R-7292 Marine Stadium Electrical Infrastructure

Closes 11/18/2026Opened 10/14/2026

U.S. Department Of The Interior·South Dakota

66% match

SD Ecological Services Office Relocation

Closes 11/30/2026Opened 10/27/2026

City of Fort Wayne·Indiana

66% match

Electrical Distribution Equipment

Closes 11/10/2026Opened 10/15/2026

Public Service Company of New Mexico·New Mexico

65% match

RFI: Transportation Electrification Program (TEP)

Closes 11/6/2026Opened 9/1/2026

Village of Key Biscayne·Florida

65% match

Key Biscayne Community Center Emergency Generator

Closes 11/9/2026Opened 9/23/2026

Mississippi

65% match

BID 27-12 – Mitchell Memorial Electrical Panel Relocation – Plans and Specifications May Be Obtained From Our Website

Closes 11/3/2026Opened 10/30/2026

California Department of Transportation·California

65% match

Electrical Services in Shasta County

Closes 11/3/2026Opened 10/14/2026

City of Cerritos·California

65% match

Addendum No. 4

Rolling / TBD closeOpened 9/1/2026

City of Douglas WY·Wyoming

65% match

SWM #1 - Surge Tank Replacement Project

Closes 11/10/2026Opened 10/23/2026

Hastings Utilities·Nebraska

65% match

Water/Sanitary Sewer Relocation HU 2026-69

Rolling / TBD closeOpened 6/30/2026

NYS Brookhaven, Town of·New York

65% match

Installation of Generators at Various Town Locations

Closes 11/13/2026Opened 10/26/2026

Metropolitan Council·Minnesota

65% match

TVM Relocation 46th Street and Nicollet Mall Stations (Contracting - with Small Business Goal)

Closes 11/4/2026Opened 10/2/2026