The San Gabriel Unified School District is seeking a qualified contractor to remove, replace, and test the irrigation system at McKinley Elementary School. The work includes complete removal of existing piping, installation of new irrigation piping, valves, controllers, and sprinklers, acquisition of all necessary permits, compliance with building, plumbing, electrical, and safety codes, and delivery of post‑construction documentation and warranties. The contract is a sealed public‑works bid with a $500,000 engineer’s estimate, requiring a 10 % bid bond, 100 % performance and payment bonds, and adherence to prevailing‑wage, DVBE participation, and drug‑free workplace requirements.
• Scope: Full removal and replacement of site irrigation infrastructure, including testing and commissioning.
• Schedule: Bid deadline 8/18/2026, award 9/8/2026, construction start 9/29/2026, substantial completion 10/30/2026.
• Requirements: California Class B, C‑27 contractor license; pre‑qualification; bid and performance bonds; insurance; DVBE 3 % participation; compliance with all state codes and safety regulations.