Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Georgia guideGeorgia Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More waste removal and collection bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Georgia
  4. ›Waste Removal and Collection
  5. ›2026-IFB-309-Bear Creek Water Treatment Plant High Service…

Georgia Douglasville-Douglas County Water and Sewer Authority·Georgia

2026-IFB-309-Bear Creek Water Treatment Plant High Service Pump Addition

Closes 2/25/2026$750k – $1.5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Douglasville-Douglas County Water and Sewer Authority is seeking bids for the Bear Creek Water Treatment Plant High Service Pump Addition project. The project involves installing an additional 2500 hp High Service Pump in the existing High Service Pump Station Building and a High Service Pump Variable Speed Drive and Control Panel in the existing Electrical Building. The contractor will also be responsible for installing new pump discharge piping and valves, wiring, and conduit for providing power and instrumentation SCADA controls. The authority has purchased the 2500 hp High Service Vertical Turine Pump and Variable Speed Control Panel, as well as the 24" diameter GA Industries Flange Pump Check Ball Valve and Control Panel. • The project requires a Utility Contractors License. • The contractor must meet the contractor's qualifications and sub-contractor's qualifications listed in the contract specification documents. • The contractor must be on, or promptly qualify for inclusion on, the Douglasville-Douglas County Water and Sewer Authority's Pre-Approved Contractors List. • All work will be performed on authority property, and all anticipated property and easements required for the project have been acquired by the authority. • All anticipated federal, state, and local permits required for the project have been obtained.

Attached files

Contact

Joseph Morency(Buyer Contact)

[email protected]

(770) 920-3864

Key dates

Opened
1/28/2026
Pre-bid meeting
2/11/2026
Closes
2/25/2026

Last updated

Details

Type
Invitation for Bid
Industry
Utilities and Waste Management
NAICS
237110
Solicitation №
IFB #309

Budget estimate

$750,000 – $1,500,000

The budget for this project can be estimated based on the scope of work, which includes the installation of a 2500 hp high service pump, variable speed drive, and control panel, as well as new pump discharge piping and valves. The cost of such a project can range from $500,000 to $2 million, depending on the complexity of the installation, the cost of materials, and the labor required. The authority has already purchased the 2500 hp High Service Vertical Turine Pump and Variable Speed Control Panel, as well as the 24" diameter GA Industries Flange Pump Check Ball Valve and Control Panel, which may reduce the overall cost of the project. However, the bid package must be obtained for a deposit of $600.00 per printed set or $25.00 per electronic set, and all bids must be accompanied by adequate bid security (certified check, bid bond, or irrevocable letter of credit) drawn in favor of the authority and in the amount of five percent (5%) of the total bid price. Considering these factors, the estimated budget range for this project is between $750,000 and $1.5 million.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Upper Occoquan Service Authority·Virginia

Top match · 74%

UOSA IFB 27-02 P2NR+ Construction

Closes 11/4/2026Opened 8/24/2026

Johnson County Wastewater·Kansas

71% match

Notice - Progressive Design Build (PDB) Services for the Brush Creek Pump Station Improvements

Rolling / TBD closeOpened 11/4/2026

Charleston Water System·South Carolina

71% match

IFB 2161 WATER TREATMENT CHEMICALS: FLUOROSILICIC ACID

Closes 11/12/2026Opened 10/26/2026

City of Holly Grove·Arkansas

71% match

City of Holly Grove Water System Improvements – Water Tank Rehabilitation and Plant Building Modification

Closes 11/18/2026Opened 10/25/2026

Dickenson County·Virginia

70% match

Dickenson County Public Service Authority Haysi Wastewater Treatment Plant

Closes 11/16/2026Opened 9/30/2026

City of San Diego·California

70% match

Pump Station 2 Improvements and Modernization (Advertisement Only : No BIDS)

Closes 12/10/2026Opened 10/28/2026

City of Bismarck·North Dakota

70% match

2027 Water/Wastewater Treatment Chemicals IFB

Closes 11/3/2026Opened 10/13/2026

City of Springfield, MO - Division of Purchases·Missouri

70% match

IFB 011-2027 Southwest Treatment Plant Centrifuge Replacement Public Works Number (2025PW0060)

Closes 12/3/2026Opened 10/8/2026

California Department of Water Resources·California

70% match

IFB 10222573 - Portable Toilet Rentals and Septic Holding Tank Pumping Services

Closes 11/12/2026Opened 10/9/2026

Catalina Foothills Unified School District·Arizona

70% match

IFB 27-03-32 BACKFLOW-TESTING-MANAGEMENT

Closes 11/5/2026Opened 10/10/2026

City of Beaumont·California

70% match

IFB 26-21 ONGOING PIPELINE REPLACEMENT (CIP WW26-12)

Closes 12/1/2026Opened 10/22/2026

City of Branson·Missouri

69% match

RFB 2900-16 Annual Lift Station Pump Rebuilds Replacements 2027

Closes 11/20/2026Opened 10/20/2026

City of Hollywood·Florida

69% match

Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261

Closes 11/25/2026Opened 10/20/2026

Oregon City of Ashland·Oregon

69% match

Ashland Water Treatment Plant

Closes 11/5/2026Opened 9/29/2026

City of Oshkosh·Wisconsin

69% match

IFB - REMOVAL/INSTALLATION OF TWO WATER METER TEST BENCHES WITH AMS TECHNOLOGY

Closes 11/10/2026Opened 10/16/2026

Brazos Valley·Texas

69% match

Well 6 Capacity Enhancement

Closes 11/12/2026Opened 10/21/2026

Parkland Health & Hospital System·Texas

69% match

IFB-1984049 - Boiler Refurbishment Services

Rolling / TBD closeOpened 1/1/2017

California Department of Water Resources·California

68% match

IFB 10222572 - Portable Toilet Rentals and Septic Holding Tank Pumping Services

Closes 11/12/2026Opened 10/9/2026

City of Long Prairie·Minnesota

68% match

Long Prairie, City of Water Treatment Plant Rehabilitation 25X.138024

Closes 11/18/2026Opened 10/29/2026

Bedford County·Virginia

68% match

(2027-3) IFB: HYBRID FIRE EXTINGUISHING SYSTEM INSTALLATION

Closes 11/9/2026Opened 10/2/2026

City of Eureka Springs·Arkansas

68% match

Construction of Eureka Springs Wastewater Treatment Plant Improvements

Closes 11/17/2026Opened 10/18/2026

City of Ashland·Oregon

68% match

City of Ashland, Ashland Creek Water Treatment Plant

Closes 11/5/2026Opened 9/29/2026

The Metropolitan Water District of Southern California·California

68% match

Inland Feeder/San Bernardino Valley Municipal Water District (SBVMWD) Foothill Pump Station Intertie, Stage 1

Closes 11/17/2026Opened 8/4/2026

St. John the Baptist Parish Government·Louisiana

68% match

RFQ 2026.30 Engineering Services for Vicknair Canal Pump Station

Closes 11/19/2026Opened 10/28/2026

Texas City of Lubbock·Texas

68% match

ITB 27--YB Hydrochloric Acid for South and North Water Treatment Water

Closes 11/12/2026Opened 10/26/2026