Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Mississippi guideMississippi Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Mississippi
  4. ›Civil Engineering
  5. ›Replacement of Water Meters Project 2024 – AMI Meter Parts

Mississippi City of Vicksburg·Mississippi

Replacement of Water Meters Project 2024 – AMI Meter Parts

Closes 1/23/2026$500k – $2MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Vicksburg, Mississippi, is seeking bids for the replacement of water meters with an AMI (Advanced Metering Infrastructure) system. The project includes the furnishing of specified meters, software, hardware, and radios compatible with the current Sensus Flexnet water and gas meter reading system. The contract will be awarded to the lowest and best proposer, with the city reserving the right to accept or reject any or all proposals. • The project requires the replacement of existing water meters with AMI-compatible meters. • The contract includes an annual term for the purchase of meter parts. • The city encourages attendance at the pre-bid conference but does not require it. • The successful bidder must adhere to the city's non-discrimination policy and comply with the Davis-Bacon and Related Acts (DBRA) requirements. • The contract documents can be obtained from Engineering Xcellence with Kris Riemann & Associates, PLLC, or downloaded from www.centralbidding.com.

Attached files

Contact

Robert K. Riemann(Engineer/Project Manager)

[email protected]

Key dates

Opened
12/3/2025
Questions due
1/12/2026
Pre-bid meeting
1/7/2026
Closes
1/23/2026

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237110
Solicitation №
193-20251121103501 Vicksburg

Budget estimate

$500,000 – $2,000,000

The budget for this contract can be estimated based on the cost of the materials and labor required for the replacement of the water meters. The document does not provide a specific budget for the project, but it mentions that the contract will be awarded to the lowest and best proposer. Assuming the cost of the materials and labor will be in the range of $500,000 to $2,000,000, considering the scope of the project and the number of meters to be replaced. The actual budget may vary depending on the bids received and the city's budget for the project. Factors influencing the likely payment range include the cost of the AMI-compatible meters, software, hardware, and radios, as well as labor costs for the installation and maintenance of the system.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Boca Raton·Florida

Top match · 78%

Installation and/or Replacement of Potable and, or Reclaimed Water Meters with AMI Transponders

Closes 11/23/2026Opened 10/20/2026

City of Boca Raton·Florida

77% match

Installation and/or Replacement of Potable and, or Reclaimed Water Meters with AMI Transponders

Closes 11/23/2026Opened 10/20/2026

City of Punta Gorda·Florida

76% match

SVC-AMI/1626 - Advanced Metering Infrastructure (AMI)

Closes 11/20/2026Opened 9/25/2026

City of Bedford, TX·Texas

75% match

Water Meter Installations

Closes 11/12/2026Opened 10/9/2026

City of Aumsville·Oregon

75% match

Automatic Metering Infrastructure Supply & Installation

Closes 11/17/2026Opened 10/20/2026

City of Pasadena·California

74% match

Advanced Metering Infrastructure (AMI) System and Installation Services

Closes 12/1/2026Opened 10/13/2026

City of Holly Grove·Arkansas

74% match

City of Holly Grove Water System Improvements – Water Meter Replacement

Closes 11/18/2026Opened 10/25/2026

Georgia City of Oxford·Georgia

72% match

City of Oxford Water and Electric Meter Replacement

Closes 11/4/2026Opened 9/29/2026

City of Punta Gorda·Florida

72% match

SVC-AMI/1626 - Advanced Metering Infrastructure (AMI) Water Utilities System

Closes 11/20/2026Opened 10/22/2026

Washington Suburban Sanitary Commission, MD·Maryland

72% match

Request for Qualification - AMI Materials

Closes 12/11/2026Opened 9/23/2026

City of Winnebago·Minnesota

72% match

Winnebago, City of Water Meter Replacement BMI Project No. 26X146003

Closes 11/18/2026Opened 10/25/2026

City of Charlotte·North Carolina

72% match

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

Georgia Jones County Board of Commissioners·Georgia

71% match

Water Meter Change Out-2026

Closes 11/5/2026Opened 9/28/2026

Massachusetts Town of Kingston·Massachusetts

71% match

Water Meter and Advanced Metering Analytics Maintenance

Closes 11/4/2026Opened 10/15/2026

Washington Suburban Sanitary Commission·Maryland

70% match

Request for Qualification - AMI Materials

Closes 12/11/2026Opened 9/23/2026

City of St. Charles·Illinois

70% match

Advanced Metering Infrastructure (AMI)

Closes 12/3/2026Opened 9/30/2026

Little Blue NRD·Nebraska

69% match

LBNRD Water Meter Replacements

Closes 12/3/2026Opened 10/23/2026

Arlington County Government·Virginia

69% match

ANNUAL FLOW METER CALIBRATION, INSTALLATION, REPAIR AND REPLACEMENT

Closes 11/9/2026Opened 10/30/2026

City of Oshkosh·Wisconsin

69% match

IFB - REMOVAL/INSTALLATION OF TWO WATER METER TEST BENCHES WITH AMS TECHNOLOGY

Closes 11/10/2026Opened 10/16/2026

The Ohio State University·Ohio

69% match

OSU-255480 JOC HHW and CHW Meter Replacement

Closes 11/12/2026Opened 10/8/2026

City of Phoenix·Arizona

69% match

Flow Meters and Level Meters Supplemental

Closes 11/5/2026Opened 10/15/2026

City of Gould·Arkansas

68% match

RFP # 24RU40001 – Contract C – Water Meters

Closes 11/2/2026Opened 10/18/2026

Washington Suburban Sanitary Commission, MD·Maryland

68% match

Furnish and Deliver Small and Large Water Meters

Closes 11/2/2026Opened 9/21/2026

Hilton Head Public Service District·South Carolina

68% match

Hilton Head Public Service District Meter Replacement RFQ

Closes 11/10/2026Opened 10/8/2026

LA Water & Power·California

68% match

146628 OWENS LAKE ABB WATERMASTER ELECTROMAGNETIC FLOW METERS

Closes 11/4/2026Opened 10/20/2026