Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Virginia guideVirginia Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More renewable energy bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Virginia
  4. ›Renewable Energy
  5. ›RFP #2026-07-VPA Battery Buffer Electric Vehicle (EV)…

Virginia Port Authority·Virginia

RFP #2026-07-VPA Battery Buffer Electric Vehicle (EV) Charging Station System

Closes 7/23/2026$5M – $10MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Virginia Port Authority (VPA) seeks proposals to design, produce, deliver, install, and commission a Battery Buffer Electric Vehicle (EV) Charging Station System consisting of 145 units for its Norfolk International Terminals (NIT) and Richmond Marine Terminal (RMT). The contract will cover engineering design, manufacturing of battery‑buffered chargers, logistics, site installation, testing, and full commissioning to support EV operations at two major port facilities in Virginia. • Scope includes complete design, fabrication, and delivery of 145 battery‑buffered EV charging stations. • Installation and commissioning at two separate port terminals (Norfolk and Richmond) with associated electrical work and integration into existing infrastructure. • VPA will evaluate proposals based on technical capability, cost, schedule, and ability to meet performance specifications for high‑throughput port environments.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Meg Guerriero

Key dates

Opened
5/28/2026
Closes
7/23/2026

Last updated

Details

Type
Request for Proposal
Industry
Renewable Energy
NAICS
238210
Solicitation №
RFP-121258

Budget estimate

$5,000,000 – $10,000,000

Estimating $30,000–$50,000 per battery‑buffered charging station (including hardware, delivery, installation, and commissioning) gives a contract value roughly between $4.35 M and $7.25 M. Adding project management, engineering, and contingency costs likely pushes the total to a $5 M–$10 M range. The estimate assumes mid‑range unit costs and typical installation expenses for a port environment.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Virginia Port Authority·Virginia

Top match · 78%

RFP 2027-10-VPA Battery Electric Locomotive Charging Solution

Closes 11/17/2026Opened 10/13/2026

County of Sonoma·California

74% match

RFQ On-Call Electric Vehicle Charging Station

Closes 11/6/2026Opened 9/24/2026

Pennsylvania Philadelphia Regional Port Authority·Pennsylvania

74% match

RFP for EV Forklifts and Charging Stations

Closes 11/17/2026Opened 10/22/2026

City of Tamarac·Florida

74% match

EV CHARGING STATION INFRASTRUCTURE- DC FAST CHARGING STATIONS

Closes 11/17/2026Opened 10/15/2026

Connecticut Energy & Environmental Protection·Connecticut

73% match

Electric Vehicle Charging Station Upgrades

Closes 11/13/2026Opened 10/23/2026

Agency of Transportation - Contract Administration·Vermont

73% match

Statewide DBOOM EVSE RFP

Closes 11/17/2026Opened 9/17/2026

California Department of State Hospitals·California

73% match

IFB 26-42015-000 Electric Vehicle Charging Stations Maintenance and Repair Services

Closes 11/6/2026Opened 10/21/2026

NYS Rockland County·New York

71% match

ELECTRIC VEHICLE CHARGING INFRASTRUCTURE STUDY

Closes 11/6/2026Opened 9/22/2026

Madison County School District·Mississippi

70% match

14-2027 Battery Backups (E-Rate)

Closes 11/10/2026Opened 10/8/2026

Wyoming Department of Transportation·Wyoming

70% match

NATIONAL ELECTRIC VEHICLE INFASTRUCTURE PROGRAM

Closes 11/18/2026Opened 9/23/2026

City of Long Beach·California

70% match

R-7282 Fleet Services EV Charging Depot

Closes 11/20/2026Opened 10/14/2026

South Coast Air Quality Management District·California

70% match

Clean Heavy Duty Vehicle Incentive Program Battery Electric Freight Vehicles for Classes 6 and 7

Closes 1/15/2027Opened 10/7/2026

New York City Department of Transportation·New York

70% match

Request for Information (RFI) Regarding Electric Vehicle Charging Incentive Program

Closes 11/30/2026Opened 9/14/2026

U.S. Department Of Defense·United States of America

69% match

CHARGER,BATTERY

Closes 11/20/2026Opened 10/21/2026

Public Service Company of New Mexico·New Mexico

69% match

RFI: Transportation Electrification Program (TEP)

Closes 11/6/2026Opened 9/1/2026

California Energy Commission·California

69% match

GFO-26-301 - Characterizing Non-Driving Electric Vehicle Energy Efficiency

Closes 11/13/2026Opened 2/9/2026

City of Pinole·California

69% match

Design Services for Electric Vehicle Charging Infrastructure for the City of Pinole

Closes 11/4/2026Opened 10/7/2026

Massachusetts Department of Transportation·Massachusetts

69% match

613689 CAMBRIDGE FAP No. HPP/STP-003E(014)X Neighborhood Electric Vehicle Charging Infrastructure

Closes 11/10/2026Opened 9/14/2026

California Department of General Services·California

69% match

Project 13751. FTB EVSE. Contract 26-340236

Closes 11/30/2026Opened 10/19/2026

City of Cincinnati·Ohio

69% match

EV Charging Rec Centers PID 122816

Closes 11/6/2026Opened 10/16/2026

Port of Stockton·California

69% match

EPA Customer Side Design & Engineering

Closes 11/12/2026Opened 10/8/2026

California Energy Commission·California

69% match

GFO-25-603 - California’s National Electric Vehicle Infrastructure Formula Program – Solicitation 6 Community Charging

Closes 11/20/2026Opened 2/23/2026

NYS Rochester-Genesee Reg. Transportation Authority·New York

68% match

Fueling Station Electrical Distribution Upgrades

Closes 11/20/2026Opened 10/26/2026

New York State Energy Research and Development Authority·New York

68% match

Charge Ready NY 2.0 Equipment and Network Qualification Process

Closes 12/31/2026Opened 4/8/2025

Illinois Environmental Protection Agency·Illinois

68% match

Driving a Cleaner Illinois - Diesel Emissions Reduction Act (DERA)

Closes 1/31/2028Opened 10/28/2026