Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›N041--Building 4 Chiller Replacement at VAMC Central…

U.S. Department Of Veterans Affairs·Maine

N041--Building 4 Chiller Replacement at VAMC Central Western MA

Closes 9/4/2026$200k – $500kRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Department of Veterans Affairs Central Western Massachusetts Medical Center seeks a verified SDVOSB to replace Building 4’s chiller on the Edward P. Boland Campus (Leeds, MA). The contractor must provide a turn‑key, in‑kind replacement of the existing Carrier chiller, including all mechanical, electrical, and controls work, refrigerant recovery, disposal, and factory‑authorized startup/commissioning. The work must be coordinated with the VA COR, adhere to all VHA, OSHA, EPA, and Massachusetts DEP regulations, and be completed within a six‑month period of performance from Notice‑to‑Proceed. No temporary cooling is required; the existing equipment pad will be reused, and all removed piping must be replaced with new insulated piping. The contract is a total SDVOSB set‑aside with a firm‑fixed‑price award. • Scope: Remove existing Carrier chiller, install equivalent Carrier unit, replace all removed piping, valves, fittings, and insulation; perform electrical connections (reuse existing service); integrate with existing SNE Building Automation System. • Duration: 6 months from NTP. • Location: 421 N Main St., Leeds, MA 01053 (VA Central Western MA Medical Center). • Mandatory requirements: Refrigerant recovery, disposal of old equipment, factory startup/commissioning, 1‑year warranty, compliance with all safety and environmental standards. • Submission: Quotes due 04 Sep 2026 4:00 PM EST (electronic email to Juliette Buchanan). Questions due 14 Aug 2026 4:00 PM EST. Site visit scheduled 13 Aug 2026 10:00 AM. • Set‑aside: 100 % verified Service‑Disabled Veteran‑Owned Small Business (SDVOSB). • Evaluation: Technical (most important) and past performance outweigh price; comparative evaluation under FAR 12.6.

Attached files

Contact

Juliette Buchanan(Contract Specialist)

[email protected]

(401) 273-7100

Key dates

Opened
8/27/2026
Questions due
8/14/2026
Site visit
8/13/2026
Closes
9/4/2026
Duration
6 months

Last updated

Details

Type
Request for Quotation
Industry
Construction
NAICS
238220
Solicitation №
36C24126Q0713

Budget estimate

$200,000 – $500,000

Based on typical costs for a full‑scale commercial chiller replacement (equipment, labor, disposal, commissioning, and warranty) at a VA medical facility, the contract value is likely in the low‑to‑mid six‑figure range. Assuming a Carrier unit sized for a medium‑sized hospital building (≈500‑700 tons) plus associated mechanical, electrical, and controls work, the estimate falls roughly between $200,000 and $500,000. Factors influencing the final amount include equipment model selection, lead‑time surcharges, site‑specific logistical constraints, and any required ancillary upgrades (e.g., pad modifications, additional insulation).

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

NYS OGS Design & Construction - Construction Contractors·New York

Top match · 75%

47690 HVAC – Replace Chiller System, Knight Hall & Dorms

Closes 12/9/2026Opened 10/27/2026

Virginia Department of Transportation·Virginia

74% match

161109 VDOT Lynchburg Admin Building Chiller Rep

Closes 11/23/2026Opened 10/23/2026

U.S. Department Of Veterans Affairs·Texas

74% match

CON | Z2DA | REPLACE CHILLER 1 B104 | 580-24-111 | SOLICITATION

Closes 12/8/2026Opened 10/30/2026

NYS OGS Design & Construction - Construction Contractors·New York

73% match

Replace Chiller System, Knight Hall & Dorms

Closes 12/9/2026Opened 10/27/2026

NYS OGS Design & Construction - Construction Contractors·New York

73% match

47690 ELECTRICAL – Replace Chiller System, Knight Hall & Dorms

Closes 12/9/2026Opened 10/27/2026

Kentucky Cabinet for Health and Family Services·Kentucky

73% match

RFB-100-27 CHFS OAK Repair Building 501 Chiller

Closes 11/10/2026Opened 10/13/2026

Trident Technical College·South Carolina

72% match

TTC - Palmer Campus Chiller Replacement **REVISION 2**

Closes 11/5/2026Opened 10/16/2026

Maryland Howard County Public Schools·Maryland

72% match

054.27.B3 Harper’s Choice Middle School Chiller & Cooling Tower Replacement

Closes 12/3/2026Opened 10/29/2026

Rock Hill School District 3·South Carolina

72% match

Mt. Gallant Chiller Replacement

Closes 11/19/2026Opened 10/20/2026

University of Missouri-Kansas City·Missouri

72% match

Dental School Chiller Replacement (KC664601)

Closes 11/12/2026Opened 10/29/2026

Trident Technical College·South Carolina

71% match

TTC - Palmer Campus Chiller Replacement *REVISED ATTACHED DOCUMENT**

Closes 11/5/2026Opened 10/13/2026

Memphis-Shelby County Schools·Tennessee

71% match

RFP 110226JKG HVAC Replacements 5 Locations

Closes 11/2/2026Opened 10/2/2026

University of Massachusetts·Massachusetts

71% match

Efficiency Review of Chiller Plants Operation & Maintenance

Closes 11/13/2026Opened 10/16/2026

Alabama United States Air Force·Alabama

71% match

McQuay Chiller Repair for 187th FW BLDG 1501

Closes 11/16/2026Opened 10/29/2026

U.S. Department Of Veterans Affairs·Puerto Rico

71% match

J041--Preventive Maintenance and Repair Services for HVAC Water Chillers and Air Handling Units (AHU) at the VA Caribbean Healthcare System (VACHS)

Closes 11/6/2026Opened 7/30/2026

U.S. Department Of Veterans Affairs·North Carolina

71% match

RENTAL OF TWO CHILLERS FOR ONE YEAR

Closes 11/10/2026Opened 10/20/2026

University of South Carolina·South Carolina

71% match

Chiller and Infrastructure Replacement-North Energy Plant Chiller#2

Closes 11/4/2026Opened 10/5/2026

U.S. Department Of Veterans Affairs·Texas

70% match

CON | Z1DA | REPLACE OR CHILLERS | 580-23-105 | SOLICITATION

Closes 12/2/2026Opened 10/29/2026

Northern Virginia Community College·Virginia

70% match

260-B6260-003 MTS Replace Rooftop Unit

Closes 11/2/2026Opened 10/1/2026

Virginia Community College System - System Office·Virginia

70% match

ATC Replace Chilled Water Central Plant at Tidewater Community College, Virginia Beach Campus, PC#260-B4260-112-c (M26TC127)

Closes 11/19/2026Opened 10/6/2026

U.S. Department Of Veterans Affairs·Maine

70% match

C221--402-27-001 Repair Chiller 3 (AE)

Closes 11/20/2026Opened 10/21/2026

U.S. Department Of Veterans Affairs·Florida

70% match

J041--Preventive Maintenance and Repair Services for HVAC Water Chillers and Air Handling Units (AHU) at the VA Caribbean Healthcare System (VACHS)

Closes 11/6/2026Opened 4/30/2026

U.S. Department Of Veterans Affairs·Illinois

70% match

J041--Condenser Coils Replacement for the VA Illiana Health Care System (VAIHCS), located at 1900 E. Main Street, Danville, IL 61832.

Closes 11/4/2026Opened 10/15/2026

The Ohio State University·Ohio

70% match

OSU-265784, Ross Heart Hospital - Low Temperature Chiller Replacement

Closes 11/18/2026Opened 10/28/2026

U.S. Department Of The Interior·Massachusetts

70% match

41--Remove and Replace Walkin Cooler and Freezer

Closes 11/5/2026Opened 10/16/2026