The West Virginia Parkways Authority (WVPA) is seeking a vendor to design, procure, install, operate, and maintain DC fast‑charging stations at four Turnpike locations (Camp Creek Lot, MP 69 Rest Area, Bluestone Travel Plaza, Beckley Travel Plaza). The contract calls for skid‑mounted chargers of at least 150 kW per stall, NE‑VI equipment compliance, utility coordination with Appalachian Power, a 30 % design package with site renderings submitted with the proposal, a detailed line‑item budget for each site, and a five‑year operations & maintenance plan that includes 24/7 service, emergency response procedures, lighting, video‑security, and data‑sharing requirements. Construction must be completed between December 2024 and April 2025, and no extensions will be granted. WVPA will retain ownership of the equipment; the developer will operate the stations and remit all user revenue back to WVPA.
• Scope: purchase, install, operate, and provide five‑year O&M for 4‑8 DC fast‑charging stalls per site (skid‑mounted, ≥150 kW).
• Technical requirements: NEVI‑compliant hardware, utility upgrades (transformers, switchgear, duct banks), lighting, video‑security, 3‑hour service window, emergency response plan.
• Deliverables: 30 % design package (renderings), site‑specific utility upgrade proposals, detailed budget, O&M plan, and compliance documentation.
• Timeline: pre‑proposal conference 9 Oct 2024; construction window Dec 2024–Apr 2025; proposals due (exact date not listed).
• Funding: fully state‑funded, no federal or NEVI grant money.