The City of Bullhead City is soliciting bids for the construction of two new blower buildings at the Section 10 WRP: the aeration basin blower building and the digester blower building. The contractor will be responsible for installation, testing, and startup of the owner-supplied materials and equipment, as well as furnishing and installing necessary materials and equipment to perform site excavation, installation of new yard piping, construction of concrete foundations, walls, and floors, masonry block walls, a roof system, doors, hatches, HVAC systems, conduit for controls and electrical wiring, and electrical equipment. Work will also involve connections to existing plant piping, protecting underground utilities, asphalt patching, replacing concrete curb and gutter, and overall site restoration disturbed by construction.
• The project requires the construction of two new blower buildings.
• The contractor must install, test, and start up the owner-supplied materials and equipment.
• The contractor must furnish and install necessary materials and equipment for site excavation, installation of new yard piping, and construction of concrete foundations, walls, and floors.
• The project involves connections to existing plant piping, protecting underground utilities, and overall site restoration.
• The contractor must coordinate with the owner's SCADA programmer.