Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Louisiana guideLouisiana Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Louisiana
  4. ›Construction
  5. ›PEDESTRIAN BRIDGES - North Cherry Street

The City of Hammond, LA·Louisiana

PEDESTRIAN BRIDGES - North Cherry Street

Closes 6/4/2026$500k – $650kInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

This solicitation seeks a qualified contractor to fabricate and construct two prefabricated steel pedestrian bridges on North Cherry Street (LA‑1065) in Hammond, Louisiana, including associated abutments, timber pile bents, side‑walks, safety handrails, traffic signage, and site‑work. The contract term is 150 calendar days with a construction cost estimate of $562,300. The work involves structural steel installation, concrete abutments, timber pile installation, and compliance with LaDOTD permits. • Two bridge spans: 120 ft over Ponchatoula Creek and 80 ft over L‑6 Canal. • Includes mobilization, back‑fill, site clearing, traffic control, concrete abutments, timber pile bents, sidewalks, and safety handrails. • Aluminum bridge members are permissible if they meet ASTM 6061‑T6 specifications; three approved bridge manufacturers are listed. • Bid security of 5 % of total bid required; bidders must provide a Louisiana Contractor’s License and corporate resolution.

Attached files

Contact

T. C. Spangler, Jr.(Engineer)

Key dates

Opened
5/7/2026
Pre-bid meeting
5/28/2026
Closes
6/4/2026
Duration
150 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237990
Solicitation №
47086

Budget estimate

$500,000 – $650,000

The solicitation lists a construction cost estimate of $562,300. Assuming typical contractor profit margins of 8‑12 % and possible change‑order allowances, the net earnings for the winning contractor would likely fall between $500,000 and $650,000. Factors influencing the range include the final bid price, any approved alternates, and the cost of required bid security.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Sacramento·California

Top match · 64%

Pedestrian Crossing at R Street and 29th/30th Streets

Closes 11/4/2026Opened 9/30/2026

Delaware River Joint Toll Bridge Commission·New Jersey

64% match

Portland‑Columbia Toll‑Supported Pedestrian Bridge Rehabilitation

Closes 11/5/2026Opened 10/1/2026

Connecticut Town of Cheshire·Connecticut

63% match

2627-05 Mixville Park Pedestrian Bridge

Closes 11/3/2026Opened 10/13/2026

Louisiana Recreation and Park Commission for the Parish of East Baton Rouge·Louisiana

63% match

Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 9/30/2026

City of Charlotte·North Carolina

63% match

Harrisburg Road Shared Use Paths (SUPs)

Rolling / TBD closeOpened 2/23/2026

Division of Highways·North Carolina

62% match

U.S. Highway 17 Pedestrian Crossing

Closes 11/19/2026Opened 10/27/2026

City of Cleveland·Ohio

62% match

North Coast Connector

Closes 12/30/2026Opened 10/1/2026

Connecticut Town of Cheshire·Connecticut

62% match

2627-05 Mixville Park Pedestrian Bridge

Closes 11/3/2026Opened 10/13/2026

City of Cedar Rapids·Iowa

62% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

New York City Department of Transportation·New York

62% match

84127P0001-TD/CSS for Crocheron Park Pedestrian Bridge Over BCIP, Borough of Queens

Closes 11/6/2026Opened 9/28/2026

City of Palm Springs·California

62% match

East Palm Canyon Bridge Project

Closes 11/20/2026Opened 10/20/2026

City of Cedar Rapids·Iowa

62% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Charlotte·North Carolina

61% match

Vision Zero Safe to School: WT Harris at Grier

Rolling / TBD closeOpened 4/1/2026

Carver County·Minnesota

61% match

Township Bridge Replacements

Closes 11/3/2026Opened 10/9/2026

City of Columbia·Missouri

61% match

Replacement of Bridge 9 on MKT Trail

Closes 11/10/2026Opened 9/29/2026

Cobb County, GA·Georgia

61% match

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

City of Cedar Rapids·Iowa

61% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

61% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Charlotte·North Carolina

61% match

Bridge Repairs

Rolling / TBD closeOpened 1/1/2027

Georgia Cobb County Department of Transportation·Georgia

61% match

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

Massachusetts Department of Transportation·Massachusetts

61% match

607349 NORWELL- PEMBROKE- MARSHFIELD- BRIDGE REPLACEMENT, N-24-004=P-05-008, ROUTE 3 (NB & SB) OVER

Closes 11/13/2026Opened 1/30/2026

City of Seattle·Washington

61% match

Pedestrian Crossing Safety Improvements (FHWA)

Closes 11/4/2026Opened 10/14/2026

City of Ontario·California

61% match

Pedestrian Intersection Improvements and Pavement Rehabilitation Project

Closes 11/18/2026Opened 10/28/2026

City of Cedar Rapids·Iowa

61% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of St. Louis Board of Public Service·Missouri

61% match

Union Lindell Bridge Replacement

Closes 11/3/2026Opened 9/16/2026