Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Civil Engineering
  5. ›New Well #16 (Part A) and 12” Raw Water Main Extension…

City of Jacksonville Beach·Florida

New Well #16 (Part A) and 12” Raw Water Main Extension (Part B)

Closes 4/15/2026$500k – $2MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Jacksonville Beach is seeking bids for the construction of a new well and a 12-inch raw water main extension. The project includes clearing and grubbing the site, drilling and constructing a new water supply well, installing a new submersible motor vertical turbine pump, and constructing a new 10-inch and 12-inch ductile iron well header pipe system. The project also includes the installation of approximately 740 linear feet of 12-inch PVC raw water main and appurtenances. The contractor shall furnish all labor, equipment, tools, services, and incidentals to complete all work required by the specifications and drawings. • The project is located at the proposed City of Jacksonville Beach New Well #16 Site. • The project includes bid alternates for emergency backup power generation and alternate production well casing system. • The contractor must be able to perform a minimum of 30% of the total contract work with their own labor workforce. • The purchase of materials and/or equipment will not be considered as part of this percentage. • The contractor shall be responsible for properly unloading, storing, installing, and maintaining all materials and equipment. • The contractor shall perform the work complete, in place, and ready for continuous service, and shall include repairs, testing, permits, cleanup, replacements, and restoration required as a result of damages caused during this construction.

Attached files

Contact

[email protected]

Key dates

Opened
3/11/2026
Pre-bid meeting
3/19/2026
Closes
4/15/2026

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237110
Solicitation №
2526-03

Budget estimate

$500,000 – $2,000,000

Based on the project description, the budget for this opportunity could be substantial, likely in the range of $500,000 to $2,000,000. This estimate is based on the scope of work, which includes the construction of a new well, a 12-inch raw water main extension, and other related infrastructure. The actual budget will depend on the bids received and the final contract award. Factors that may influence the likely payment range include the complexity of the project, the materials and equipment required, and the labor costs associated with the construction.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Salina·Kansas

Top match · 71%

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/6/2026

Irvine Ranch Water District·California

71% match

Wells 6, 12, 14, and 15 Site Improvements

Closes 11/18/2026Opened 10/15/2026

City of DeLand·Florida

70% match

2026 PARTS A-C, & F WALTS AVE & NEW ST WATER MAIN IMPROVEMENTS

Closes 11/12/2026Opened 10/9/2026

City of Muskogee·Oklahoma

70% match

Addendum 1 - HWY 165 Waterline Extension

Rolling / TBD closeOpened 9/16/2026

City of Salina·Kansas

70% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 7/31/2026

City of Salina·Kansas

69% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/3/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

69% match

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

City of Salina·Kansas

69% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 7/31/2026

Massachusetts Town of Pembroke·Massachusetts

69% match

Pembroke Well 4R Implementation

Closes 11/18/2026Opened 10/27/2026

City of Salina·Kansas

69% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/5/2026

City of Salina·Kansas

69% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/7/2026

Bossier Parish Police Jury·Louisiana

68% match

Goodwill Road at Highway 80 – Well #29 (Well #23 Replacement) – Consolidated Waterworks/Sewerage District No. 1

Closes 11/5/2026Opened 10/7/2026

Georgia Rockdale County Board of Commissioners·Georgia

68% match

Water Main Extensions

Closes 12/3/2026Opened 10/26/2026

City of Dunedin·Florida

67% match

Water Production Well Facilities Project

Closes 11/18/2026Opened 10/12/2026

City of Melbourne·Florida

67% match

Above Grade Wells 5 & 6

Closes 11/4/2026Opened 9/28/2026

Kenai Peninsula Borough·Alaska

67% match

North Peninsula Recreation Service Area Pool – New Well (ITB27‑013)

Closes 11/5/2026Opened 10/20/2026

City of Columbus·Ohio

67% match

PAWP Wellfield Development

Closes 11/4/2026Opened 10/5/2026

Montana Department of Natural Resources and Conservation·Montana

67% match

2026 Summit DMA Orphan Well P&A

Closes 11/24/2026Opened 10/30/2026

City of Bellevue·Washington

67% match

2027 Phase 1 Water Main Replacement

Closes 11/12/2026Opened 10/22/2026

Massachusetts Town of Ayer·Massachusetts

67% match

Well Cleaning and Redevelopment

Closes 11/13/2026Opened 10/14/2026

Gwinnett County Government·Georgia

66% match

Ravenwood Drive Water Main Replacement

Closes 12/9/2026Opened 10/22/2026

City of DeLand·Florida

66% match

2024 Downtown South Water Main Improvements-East Phase

Closes 11/17/2026Opened 10/13/2026

Goodwyn Mills Cawood·Georgia

66% match

Mechanicsville & Jones Mill Road Water Main Replacement

Closes 11/12/2026Opened 10/1/2026

Northern Kentucky Water District·Kentucky

66% match

Amsterdam Road Water Main Replacement

Closes 11/5/2026Opened 10/16/2026

City of Red Oak·Texas

66% match

12-Inch and 10-Inch Carson Street Water Lines

Closes 11/17/2026Opened 10/27/2026