The City of Jacksonville Beach is seeking bids for the construction of a new well and a 12-inch raw water main extension. The project includes clearing and grubbing the site, drilling and constructing a new water supply well, installing a new submersible motor vertical turbine pump, and constructing a new 10-inch and 12-inch ductile iron well header pipe system. The project also includes the installation of approximately 740 linear feet of 12-inch PVC raw water main and appurtenances. The contractor shall furnish all labor, equipment, tools, services, and incidentals to complete all work required by the specifications and drawings.
• The project is located at the proposed City of Jacksonville Beach New Well #16 Site.
• The project includes bid alternates for emergency backup power generation and alternate production well casing system.
• The contractor must be able to perform a minimum of 30% of the total contract work with their own labor workforce.
• The purchase of materials and/or equipment will not be considered as part of this percentage.
• The contractor shall be responsible for properly unloading, storing, installing, and maintaining all materials and equipment.
• The contractor shall perform the work complete, in place, and ready for continuous service, and shall include repairs, testing, permits, cleanup, replacements, and restoration required as a result of damages caused during this construction.