The Taylor School District is seeking a single‑prime contractor to furnish all labor, materials, and equipment for a comprehensive HVAC upgrade at Hoover Middle School. The scope includes selective demolition of existing HVAC systems, installation of new ductwork, air‑handling units, packaged condensers, hydronic piping, control systems (DDC), fire detection integration, and related electrical work. The project must comply with NFPA 72, local codes, and the district’s schedule, with construction slated for January 2027 through August 2027. Bids are due September 3, 2026, and the district may award the contract to the most responsive and responsible bidder, not necessarily the lowest. • Location: Hoover Middle School, 27101 Beverly, Taylor, MI 48180 • Contract Type: Single‑prime, non‑mandatory pre‑bid conference (site visits optional) • Required submittals: Bid guarantee (10 % of bid) or certified check, insurance certificates, workers’ comp, performance bond (not required) • Project timeline: approx. 8 months (Jan 2027–Aug 2027) • Key deliverables: New HVAC equipment, duct insulation, control systems, testing & balancing, fire alarm integration, training & close‑out documentation.