Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Ohio guideOhio Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Ohio
  4. ›Construction
  5. ›D11 - Pedestrian Crossing for Conotton Valley Active…

Ohio Department of Transportation·Ohio

D11 - Pedestrian Crossing for Conotton Valley Active Transportation Plan

Closes 9/21/2026$12k – $35kRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Ohio Department of Transportation (ODOT) seeks a qualified vendor to supply and install high‑visibility longitudinal thermoplastic pavement markings at thirteen pedestrian crosswalk locations within the Conotton Valley School District (Bowerston, Leesville, and Sherrodsville). The contract includes material procurement, mobilization, installation, and ongoing maintenance of the markings, adhering to ODOT Spec 644. This is a single‑lot RFQ (Lot #1) with a submission window from September 15 to September 21 2026. The successful bidder must possess a valid OAKS ID/OH|ID registration with the State of Ohio. • Install 13 high‑visibility crosswalks using ODOT Spec 644 longitudinal thermoplastic markings. • Provide all materials, mobilization, installation labor, and post‑installation maintenance. • Work must be performed at the specific intersections listed in the solicitation documents. • Vendor must be OAKS‑registered and submit a complete quotation by the deadline.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Key dates

Opened
9/15/2026
Questions due
9/21/2026
Closes
9/21/2026

Last updated

Details

Type
Request for Quotation
Industry
Construction
NAICS
237310
Solicitation №
SRC0000041334

Budget estimate

$12,000 – $35,000

Based on typical ODOT thermoplastic crosswalk costs (material ≈ $300‑$600 per marking, labor ≈ $200‑$500 per marking, plus mobilization fees), 13 locations would likely range from $12 000 to $35 000 total. Rural Ohio sites may have lower crew rates, but travel and equipment mobilization add overhead, pushing the high end upward. Hence a reasonable estimate is $12k‑$35k.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Delaware Valley Regional Planning Commission·Pennsylvania

Top match · 70%

Schuylkill River Pedestrian and Cyclist Bridge Feasibility Study (TCDI Project Category 5 – Transportation and Infrastructure Planning)

Closes 12/4/2026Opened 10/30/2026

City of Sacramento·California

68% match

Pedestrian Crossing at R Street and 29th/30th Streets

Closes 11/4/2026Opened 9/30/2026

City of Park Ridge·Illinois

68% match

Active Transportation Plan

Closes 11/6/2026Opened 10/15/2026

City of Pasadena·California

68% match

HSIP Cycle 11 Pedestrian Crossing Enhancements

Closes 11/19/2026Opened 10/26/2026

New York City Department of Transportation·New York

67% match

84127P0001-TD/CSS for Crocheron Park Pedestrian Bridge Over BCIP, Borough of Queens

Closes 11/6/2026Opened 9/28/2026

Minnesota Department of Administration·Minnesota

67% match

Minnesota Valley State Trail; Nine Mile Creek to Interstate 35W

Closes 11/17/2026Opened 10/15/2026

Division of Highways·North Carolina

66% match

U.S. Highway 17 Pedestrian Crossing

Closes 11/19/2026Opened 10/27/2026

Maryland State Highway Administration·Maryland

66% match

AA9205179 - MD 3 BU (New Cut Road / Crain Highway) from MD 997 E (Stevenson Road) to Oak Manor Drive Pedestrian Safety Action Plan Project

Closes 11/5/2026Opened 9/29/2026

City of Carlsbad·California

66% match

Village Pedestrian Lighting

Closes 11/5/2026Opened 10/1/2026

Town of Westwood·Massachusetts

65% match

Pedestrian Safety Improvements

Rolling / TBD closeOpened 4/2/2026

Virginia Department of Transportation·Virginia

65% match

B33_2027 PEDESTRIAN SAFETY IMPROVEMENTS

Closes 11/18/2026Opened 10/13/2026

Maryland Department Of General Services·Maryland

65% match

P-020-170-002A Bridge Crossing and Trail Improvements at Patapsco Valley State Park – Mckeldin Area

Closes 1/11/2027Opened 10/31/2026

Virginia Department of Transportation·Virginia

65% match

A46_2027 SMART SCALE - SHARED USE PATH

Closes 11/18/2026Opened 10/14/2026

Maryland State Highway Administration·Maryland

65% match

HO5415179 - US 1 (Washington Boulevard) from MD 979 (Main Street) to Gorman Road Pedestrian Safety Action Plan

Closes 11/24/2026Opened 10/20/2026

Delaware River Joint Toll Bridge Commission·New Jersey

65% match

Portland‑Columbia Toll‑Supported Pedestrian Bridge Rehabilitation

Closes 11/5/2026Opened 10/1/2026

City of Charlotte·North Carolina

64% match

Harrisburg Road Shared Use Paths (SUPs)

Rolling / TBD closeOpened 2/23/2026

City of Richmond Government·Virginia

64% match

VDOT IFB #270004813 - US 60Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)

Closes 12/1/2026Opened 10/23/2026

City of Oakland Park·Florida

64% match

Professional Planning and Engineering Consulting Services for NE 36th Street Railroad Crossing Elimination (RCE) Project

Closes 12/3/2026Opened 10/27/2026

New York City Department of Transportation·New York

64% match

84127P0001-TD/CSS for Crocheron Park Pedestrian Bridge Over BCIP, Borough of Queens

Closes 11/6/2026Opened 9/28/2026

City of Seattle·Washington

64% match

Pedestrian Crossing Safety Improvements (FHWA)

Closes 11/4/2026Opened 10/14/2026

U.S. Department Of Transportation·Washington

64% match

ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1

Closes 8/20/2028Opened 8/20/2026

City of Santa Cruz·California

64% match

HSIP 11 & 12: UNSIGNALIZED CROSSING IMPROVEMENT PROJECT

Closes 11/5/2026Opened 10/21/2026

Cobb County·Georgia

64% match

Chattahoochee River Trail – FM SR 139 to Nickajack Creek – Phase II Public Notice of Advertisement

Closes 4/8/2027Opened 9/21/2026

City of Richmond·California

64% match

Richmond Greenway Bridge Project – Implementation Plan

Closes 11/19/2026Opened 10/19/2026

Massachusetts Northern Middlesex Council of Governments·Massachusetts

64% match

NMCOG Coordinated Public Transit-Human Services Transportation paln

Closes 11/23/2026Opened 10/26/2026