The Auraria Higher Education Center is seeking bids for the King Center Performance Lighting Replacement project. The project involves the selective demolition of existing lighting fixtures and associated electrical systems, installation of new performance and architectural lighting fixtures, and modifications to existing electrical infrastructure within five theatrical performance areas. The contractor will be required to coordinate all work with the AHEC Project Manager, maintain operations of theatrical and support spaces as needed, and phase the work to minimize disruption in the building. The contractor must also provide temporary power or lighting as required to maintain building operations.
Key aspects of the project include:
• Removal and replacement of existing lighting controls and fixtures
• Installation of new lighting control systems, including relay panels, control devices, and switches
• Integration of theatrical lighting systems and architectural lighting controls
• Coordination with architectural ceiling types and layouts
• Compliance with State prevailing wage rates and labor laws
• Provision of payment and performance bonds
The project is expected to start on August 7, 2026, and be completed by November 5, 2026 (approximately 90 days).