Texas State University is seeking a qualified general contractor to execute a comprehensive HVAC renovation of the campus “Mitte” building. The scope includes demolition of existing equipment, replacement and upgrade of 18 hydronic air‑handling units (AHUs), installation of new fans, coils, variable‑frequency drives (VFDs), control integration to the university’s building automation system, addition of structural steel supports, fire‑ and smoke‑damper installations, and full testing, adjusting, and balancing (TAB) with commissioning. The contractor must provide all labor, materials, equipment, temporary heating/cooling, comply with Texas building codes, prevailing‑wage requirements, insurance and bonding thresholds, and meet the university’s VetHUB subcontracting goals (minimum 32.9% to special‑trade subcontractors).
• Upgrade 18 existing AHUs, including fans, coils, VFDs, and BACnet‑compatible controls.
• Provide demolition, new structural supports, fire‑/smoke‑damper installation, and complete TAB/commissioning.
• Must satisfy Texas prevailing‑wage, insurance, performance‑bond, and VetHUB subcontracting requirements.
• Mandatory pre‑proposal conference and site visit on Oct 29, 2026; questions due Nov 13, 2026; bid deadline Nov 20, 2026.