Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Wyoming guideWyoming Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More environmental services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Wyoming
  4. ›Environmental Services
  5. ›South Fork Ditch Creek Fish Passage Project

Trout Unlimited·Wyoming

South Fork Ditch Creek Fish Passage Project

Closes 10/30/2026$250k – $750kRequest for ProposalLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

Trout Unlimited is seeking a qualified consulting firm to design, permit, and support construction of a fish‑passage restoration on the South Fork of Ditch Creek in Wyoming. The work includes developing alternatives, completing environmental compliance documents, obtaining permits, producing 60% and 90% design packages, and providing on‑site construction support. Two existing culverts block passage for Snake River cutthroat trout; the project aims to replace them with a stream‑simulation crossing that also improves roadway safety and drainage. The consultant must deliver a phased scope from kickoff through final design and construction assistance, with a mandatory site visit on 20 Oct 2026 and a bid deadline of 6 Nov 2026. • Scope: alternatives analysis, environmental permitting, preliminary (60%) and detailed (90%) engineering design, final design, construction‑phase support. • Deliverables: design drawings, hydraulic and geomorphic analyses, permit applications, cost estimates, construction observation reports. • Schedule: kickoff Nov 2026, concept alternatives Jan 2027, 60% design Mar 2027, 90% design May 15 2027, construction support thereafter. • Required qualifications: minimum five fish‑passage project references, Wyoming business registration, experienced personnel. • Evaluation: 40% qualifications, 40% technical approach, 20% fee.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Kole Stewart(Snake River Headwaters Senior Project Manager)

[email protected]

(785) 871-2027

Key dates

Opened
10/9/2026
Questions due
10/30/2026
Site visit
10/20/2026Mandatory
Closes
10/30/2026
Duration
7 months

Last updated

Details

Type
Request for Proposal
Industry
Environmental Services
NAICS
541620
Solicitation №
2026-002

Budget estimate

$250,000 – $750,000

The solicitation does not disclose a contract value. Comparable fish‑passage and small‑scale transportation engineering projects in the western U.S. typically range from $250,000 to $750,000 for full‑service consulting (design, permitting, and construction support). The estimate assumes a mid‑size watershed, multiple design phases, and required environmental documentation. Factors influencing the final amount include the number of design alternatives, permitting complexity, and the duration of construction‑phase support.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Fish and Wildlife Service·United States of America

Top match · 69%

F26AS00105 National Fish Passage Program

Closes 4/30/2027Opened 8/24/2026

Santa Clara Valley Water District·California

69% match

Fishery Habitat Characterization and Identification of Restoration Opportunities: Stevens Creek

Closes 12/7/2026Opened 10/21/2026

California Grants·California

68% match

Wildlife Corridor and Fish Passage

Rolling / TBD closeOpened 6/18/2025

Massachusetts Department of Fish and Game·Massachusetts

68% match

DMF Municipal Fish Passage Restoration Grant

Closes 2/26/2027Opened 2/26/2024

California Department of Transportation·California

67% match

Construct bridge structure for fish passage restoration.

Closes 12/3/2026Opened 10/12/2026

Clean River Partners·Minnesota

67% match

Clean River Partners Cannon River Fish Passage Improvements Project No. 24X.135410

Closes 11/20/2026Opened 10/29/2026

U.S. DOC NOAA - ERA Production·United States of America

66% match

NOAA Great Lakes Fish Habitat Restoration Partnership Grants

Rolling / TBD closeOpened 8/27/2024

Illinois Natural Resources·Illinois

64% match

Invasive Carp removal and monitoring in the Upper Mississippi River FY26

Rolling / TBD closeOpened 6/1/2025

U.S. Department Of Defense·Florida

63% match

Notice of Intent to solicit a single source – Fish and Macroinvertebrate (Nekton) Monitoring (St. Johns River)

Closes 11/11/2026Opened 10/27/2026

Laramie Rivers Conservation District·Wyoming

63% match

Laramie River - Hart Ranch Restoration

Closes 11/8/2026Opened 8/27/2026

Wyoming State Construction Department·Wyoming

63% match

Clark's Fork Fish Hatchery Asphalt Improvements Phase 2 - Game & Fish

Closes 12/8/2026Opened 10/28/2026

Illinois Natural Resources·Illinois

63% match

Illinois support of Ohio River Basin Asian Carp control and management (FY26)

Rolling / TBD closeOpened 6/1/2025

California Grants·California

63% match

Stream Flow Enhancement

Rolling / TBD closeOpened 6/6/2025

Florida Keys Aqueduct Authority·Florida

63% match

Snake Creek Subaqueous Crossing

Closes 11/23/2026Opened 9/30/2026

Cobb County·Georgia

63% match

Chattahoochee River Trail – FM SR 139 to Nickajack Creek – Phase II Public Notice of Advertisement

Closes 4/8/2027Opened 9/21/2026

Illinois Natural Resources·Illinois

63% match

Invasive Carp removal and monitoring in the Upper Mississippi River (CAFWS-181)

Rolling / TBD closeOpened 1/1/2026

California Grants·California

63% match

Nature Based Solutions – Wildlife Corridors

Rolling / TBD closeOpened 6/16/2025

Confederated Tribes of the Colville Reservation·Washington

63% match

F&W Anadromous Fisheries Division, Salmon Creek RM8 Fish log procurement

Closes 11/19/2026Opened 10/14/2026

U.S. Department Of The Interior·Idaho

62% match

Z--ID-KOOSKIA NATIONAL FISH- GUTTER RPLCMNT

Closes 11/17/2026Opened 10/28/2026

City of Dubuque·Iowa

62% match

North Fork Catfish Creek Multi-Site Design Services

Closes 11/6/2026Opened 10/9/2026

U.S. Fish and Wildlife Service·United States of America

62% match

F26AS00068 Partners for Fish and Wildlife FY26

Rolling / TBD closeOpened 4/8/2026

U.S. Fish and Wildlife Service·United States of America

62% match

F26AS00062: Great Lakes Fish and Wildlife Restoration Act FY 2026

Rolling / TBD closeOpened 6/1/2026

California Grants·California

62% match

Proposition 68 Fish and Wildlife Improvement Grant Program

Rolling / TBD closeOpened 4/8/2025

Confederated Tribes of the Colville Reservation·Washington

62% match

F&W Anadromous Fisheries Division, Salmon Creek RM8 Fish log procurement

Closes 11/19/2026Opened 10/14/2026

Illinois Natural Resources·Illinois

62% match

Illinois support of Upper Mississippi River Asian Carp control and management (FY25)

Rolling / TBD closeOpened 6/1/2024