Chapel Hill Independent School District (CHISD) is seeking qualified commercial roofing contractors to completely replace the existing flat‑roof system on the Bloodsworth Gym at Chapel Hill High School. The contract covers full tear‑off, disposal, deck repair, installation of a GAF 60‑mil TPO membrane with RhinoBond attachment (or approved equal), all flashing, gutters, edge metal, and required accessories, plus warranties, safety, site protection, and post‑completion close‑out documentation. Bidders must attend a mandatory pre‑bid walk‑through on 10/13/2026, submit detailed pricing (base bid and unit prices for possible additional work), and provide insurance, bonding, and licensing documentation. Evaluation will be based on price (30 %), qualifications (25 %), past relationship (25 %), and references/experience (20 %). The project is expected to be completed within a short, reasonable timeframe after award. • Scope: full roof tear‑off, deck repair, install TPO roofing system, gutters, edge metal, flashing, and related accessories. • Mandatory pre‑bid site walk‑through 10/13/2026. • Submission deadline 10/29/2026. • Award expected 11/17/2026. • Required warranties: 25‑year manufacturer NDL, 5‑year workmanship. • Insurance/bonding minimums specified. • Evaluation criteria weighted toward price and past performance.