The contract covers a complete refurbishment of three existing water‑tube boilers at the Wallkill Correctional Facility, replacement of the feed‑water system, and upgrades to the plant’s HVAC and electrical infrastructure. The scope includes installation of new combustion‑control hardware, variable‑speed blowers, a plant‑master PLC controller, low‑voltage distribution transformers, and two 300 kW diesel‑engine generators for temporary power, as well as extensive site work such as asbestos abatement, demolition, and restoration.
• Full mechanical overhaul of Boiler 1, 2, 3 (retube, refractory, casing, insulation) with new burner‑management and flame‑safeguard systems.
• Installation of new deaerator, surge‑tank, feed‑water pumps, and associated piping, gauges, and low‑water cut‑offs.
• Electrical upgrades including new transformers, paralleling low‑voltage switchgear, emergency‑shutdown panels, and a 300 kW standby generator with ATS.
• Required temporary‑boiler and generator provision (to be delivered within 60 days of award) and comprehensive testing, commissioning, and training.
• Site‑specific requirements: pre‑bid site visit on 9/11/2026, asbestos removal, erosion‑control, and strict compliance with NYS building, energy, and safety codes.