Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Massachusetts guideMassachusetts Bids and Bidding Guide
  • Transportation RFPsTransportation and Public Transit Bids and Bidding Guide
  • How to answer an RFIRFI Meaning: What Is an RFI?
More transportation and public transit bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Massachusetts
  4. ›Transportation and Public Transit
  5. ›RFI 82-26 TRANSIT STATION PLATFORM SCREEN DOORS

Massachusetts Bay Transportation Authority·Massachusetts

RFI 82-26 TRANSIT STATION PLATFORM SCREEN DOORS

Closes 6/18/2026$10M – $50MRequest for Information
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Massachusetts Bay Transportation Authority (MBTA) is seeking information from interested respondents concerning available transit station platform screen door systems. The MBTA is looking to enhance passenger safety on raised rapid transit platforms with a reliable and cost-effective system that requires minimal resources to operate and maintain. The system must be capable of detecting when trains are arriving/departing the station and automatically deploy/retract screen doors to allow for safe and efficient offboarding and onboarding of passengers. The system must also ensure accessibility and emergency egress operations, be vandal and tamper resistant, and comply with all applicable Federal, State, and local requirements. • The MBTA operates different trainsets with varying numbers of doors and door locations, power contact systems, and signaling systems. • The exact location at which trains stop at station platforms is controlled by the operator and is not consistent. • The system must be capable of supporting MBTA transit operations up to 21 hours a day, 7 days a week, 365 days a year with 4-to-6-minute headways between trains. • The system must include safeguards against malicious operation by non-MBTA actors. • The system must be capable of detecting when trains are arriving/departing the station and automatically deploy/retract screen doors to allow for safe and efficient offboarding and onboarding of passengers.

Attached files

Contact

Rob Weiner(Strategic Sourcing Manager)

[email protected]

Key dates

Opened
5/13/2026
Questions due
5/21/2026
Closes
6/18/2026

Last updated

Details

Type
Request for Information
Industry
Transportation and Public Transit
NAICS
485110
Solicitation №
BD-26-1206-40000-40000-129378

Budget estimate

$10,000,000 – $50,000,000

The budget for this project is difficult to estimate, as the RFI does not provide a specific budget or cost range. However, considering the scope of the project, which involves the installation of platform screen door systems at MBTA stations, the cost could be substantial. The cost of such systems can vary widely depending on the technology, materials, and installation requirements. As a rough estimate, the cost of a single platform screen door system could range from $500,000 to $2 million, depending on the complexity of the system and the number of doors required. For a large-scale project like this, the total cost could be in the tens of millions of dollars. Therefore, a possible budget range for this project could be $10 million to $50 million.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Iowa Department of Transportation·Iowa

Top match · 61%

Iowa DOT Repair Shop Annex Overhead Door Tracks

Closes 11/10/2026Opened 10/27/2026

NYS Canandaigua, City of·New York

61% match

Fire Station #2 Overhead Doors

Closes 11/5/2026Opened 10/2/2026

Washington Metropolitan Area Transit Authority (WMATA)·District of Columbia

61% match

RFI - Bus Passenger Counting Systems

Closes 11/30/2026Opened 10/27/2026

Oregon Lane Transit District·Oregon

60% match

RFP Notice - 20260097 -- Rear Facing ADA Securement - Parts and Labor

Closes 11/13/2026Opened 10/19/2026

Toledo Area Regional Transit Authority·Ohio

60% match

Transit Hub Elevator Additions

Closes 11/23/2026Opened 10/22/2026

U.S. Department Of Defense·California

60% match

25--LATCH,DOOR,VEHICULAR

Closes 11/1/2026Opened 10/22/2026

City of Branson·Missouri

60% match

RFB 2892-02 Overhead Doors & Entryway Doors 2027

Closes 11/4/2026Opened 10/5/2026

City of Fresno·California

60% match

Request For Information (RFI) for Transit Management Software

Closes 11/20/2026Opened 10/7/2026

Rhode Island Public Transit Authority·Rhode Island

60% match

RFI Transit Hub Bicycle Storage Solutions

Closes 11/9/2026Opened 10/9/2026

Southeastern Pennsylvania Transportation Authority·Pennsylvania

60% match

RFI – Intelligent Transport System (ITS) Modernization for Real-Time Passenger Information

Closes 11/23/2026Opened 10/31/2026

City of Rapid City·South Dakota

60% match

Transit Bus Shelters

Closes 11/10/2026Opened 10/19/2026

Southeastern Pennsylvania Transportation Authority·Pennsylvania

60% match

BOARD ROTEM ESP01508-002 VIDEO RX

Rolling / TBD closeOpened 7/29/2026

U.S. Department Of Defense·United States of America

60% match

25--DOOR,VEHICULAR

Closes 11/3/2026Opened 10/20/2026

Massachusetts Bay Transportation Authority·Massachusetts

60% match

RFP 104-26: Bus Stop Sign Fabrication and Installation Services

Closes 11/18/2026Opened 9/30/2026

North Texas Tollway Authority·Texas

60% match

RFI 29852 - Safety Operation Center Video Wall Processor

Closes 12/4/2026Opened 10/30/2026

U.S. Department Of Defense·United States of America

60% match

DOOR,AIRCRAFT

Closes 11/23/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

59% match

25--DOOR,VEHICULAR

Closes 11/8/2026Opened 10/26/2026

Iowa Department of Administrative Services·Iowa

59% match

Fire Panel Systems

Closes 11/3/2026Opened 10/2/2026

Massachusetts Bay Transportation Authority·Massachusetts

59% match

RFP:105F-26 Shuttle Bus Services

Closes 11/4/2026Opened 9/16/2026

Iowa Transportation·Iowa

59% match

Iowa DOT Repair Shop Annex Overhead Door Tracks

Closes 11/10/2026Opened 10/25/2026

Iowa Department of Administrative Services·Iowa

59% match

Fire Panel System

Closes 11/3/2026Opened 10/2/2026

Monterey-Salinas Transit·California

59% match

IFB #27-02 – Purchase and Installation of Digital Displays for MST Transit Centers and JAZZ Shelters

Closes 11/4/2026Opened 10/9/2026

U.S. Department Of Defense·United States of America

59% match

DOOR,AIRCRAFT

Closes 11/23/2026Opened 10/23/2026

U.S. Department Of Defense·Utah

59% match

FD2020-22-00154

Closes 11/15/2026Opened 11/15/2021

Massachusetts Bay Transportation Authority·Massachusetts

59% match

RFP 112-26 Centralized Train Control System

Closes 11/30/2026Opened 8/21/2026