The Auraria Higher Education Center is seeking bids from electrical contractors for the King Center Performance Lighting Replacement project. The project includes the selective demolition of existing lighting fixtures and associated electrical systems, installation of new performance and architectural lighting fixtures, and modifications to existing electrical infrastructure within the five theatrical performance areas. The contractor must coordinate all work with the AHEC Project Manager, maintaining operations of theatrical and support spaces as needed. The scope of services includes electrical construction contracting services for the project, and the contractor must meet minimum requirements, including having specific electrical contracting experience and demonstrated bonding capability.
Some key points to consider:
• The project is located in an active and occupied performance building, so the contractor must phase the work to minimize disruption.
• The contractor must maintain continuity of all existing circuits serving devices and systems that are to remain.
• The contractor must provide temporary power or lighting as required to maintain building operations.
• The project requires State Electrical Permits and Inspections, Final Building Inspections, and Denver Fire Department Inspections.
• The contractor must comply with the enforcement provisions of C.R.S. §24-92-209 and utilize the LCPTracker cloud-based labor compliance and certified payroll application.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.