The County of Clackamas is seeking a qualified contractor to perform demolition, concrete work, and generator‑pad installation for the Central Utility Plant Utilidor Upgrade. The scope includes interior CMU wall demolition, structural steel assembly, concrete slab formation for three on‑site generators, sub‑grade excavation, backfill, and associated site‑work, all performed under prevailing‑wage and safety regulations. Bids are due 15 Oct 2026; the contract is estimated at roughly $92 k, with work to be substantially completed by mid‑March 2027 and fully closed out by end‑April 2027.
• Demolition of existing concrete masonry wall and related interior work.
• Excavation, back‑fill, and placement of new concrete pads for three generators (≈37 k lb each).
• Structural steel fabrication, field welding, and anchoring of equipment pads.
• All work must comply with Oregon Structural Specialty Code, IBC, ACI, AISC, and AWS standards, and include required bonds and warranties.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.