The US Army is seeking a contractor to provide temporary boiler services. The contractor will be required to supply, install, and test operate two 800hp/250psi max pressure transportable steam boilers with natural gas connections. The boilers will be used to provide steam to two different locations on post. The period of performance for the first boiler is from May 22nd to June 20th, 2026, and for the second boiler is from June 20th to July 10th, 2026.
• The contractor must provide all labor, material, equipment, and supervision in accordance with all applicable codes and specifications.
• The contractor must ensure that the boilers are installed and operated in accordance with all specifications listed in the solicitation.
• The contractor must provide a firetube boiler with a natural gas connection and an operating pressure of 160psi.
• The contractor must use welded black pipe and fittings instead of hoses.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.