Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Construction
  5. ›Berth 266 Bulkhead Construction (Metro Port)

Tampa Port Authority d/b/a Port Tampa Bay·Florida

Berth 266 Bulkhead Construction (Metro Port)

Closes 10/22/2026$4M – $8MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

This solicitation calls for the design‑build construction of a 1,200‑ft bulkhead at Berth 266 of the Metro Port, featuring a combination pipe‑and‑Z‑sheet‑pile wall anchored with a reinforced concrete cap, anchor wall system, tie‑rods, mooring bollards, high‑wind mooring dolphins, a foam‑filled fender system, and a concrete apron slab. The work includes installation of structural hardware and associated marine‑site utilities, with multiple addenda and clarifications issued throughout the procurement process. • Approx. 1,200 linear ft of sheet‑pile bulkhead with reinforced concrete cap and anchorage • Installation of mooring bollards, high‑wind dolphins, and a foam‑filled fender system • Required submission of electronic plans; e‑bidding enabled; multiple addenda (1‑4) and clarification letters issued • Pre‑bid teleconference (non‑mandatory) scheduled for 17 Sept 2026; site‑visit details not disclosed

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Amanda Roche(Purchasing)

[email protected]

(813) 905-5008

Key dates

Opened
9/11/2026
Pre-bid meeting
9/17/2026
Closes
10/22/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237990
Solicitation №
ITB-ITB 009-26 / Project No. 26-00726-0-2027/AR

Budget estimate

$4,000,000 – $8,000,000

Based on typical market rates for marine bulkhead construction (approximately $3,500‑$7,000 per linear foot for sheet‑pile, concrete cap, and associated hardware) and the 1,200 ft scope, the contract value is likely in the $4 million‑$8 million range. Additional costs for mooring devices, dolphins, and fender systems could push the high end upward, while a streamlined design could keep the low end near $4 million.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Pennsylvania

Top match · 69%

JP Murtha Float Mooring Bitts Retrofit

Closes 11/15/2026Opened 9/1/2026

Jacksonville Port Authority·Florida

68% match

TALLEYRAND MARINE TERMINAL (TMT) PILE, CAP, AND BEAM REHAB

Closes 11/3/2026Opened 10/1/2026

Port of San Diego·California

68% match

STRUCTURAL REPAIRS AT NCMT BERTHS 24-3 AND 24-4, NATIONAL CITY

Closes 11/4/2026Opened 9/22/2026

U.S. Department Of Defense·Pennsylvania

67% match

BULKHEAD

Closes 11/27/2026Opened 10/28/2026

Mississippi Department of Marine Resources·Mississippi

67% match

Ocean Springs Harbor Project

Closes 11/17/2026Opened 10/14/2026

U.S. Department Of Defense·Pennsylvania

67% match

JP Murtha Float Mooring Bitts Retrofit

Closes 11/15/2026Opened 9/11/2026

U.S. Department Of Defense·Pennsylvania

67% match

JP Murtha Float Mooring Bitts Retrofit

Closes 11/5/2026Opened 10/6/2026

New York City Department of Parks and Recreation·New York

66% match

M289-120M East River Esplanade E36-38 St Seawall Reconstruct

Closes 11/19/2026Opened 10/16/2026

Virginia Institute of Marine Science·Virginia

66% match

VIMS CONSTRUCT R/V VIRGINIA (RVVA) BERTHING

Closes 11/11/2026Opened 10/9/2026

U.S. Department Of Defense·Washington

66% match

HATCH

Closes 11/18/2026Opened 10/29/2026

Massachusetts Town of Plymouth·Massachusetts

66% match

22623 Town Wharf Repairs - Phase II

Closes 11/19/2026Opened 10/29/2026

Georgia Chatham Area Transit Authority·Georgia

66% match

CAT PLANT RIVERSIDE FERRY DOCK AND SHELTER

Closes 11/6/2026Opened 10/6/2026

Port of Lake Charles·Louisiana

66% match

Bulk Terminal No. 1 Junction House Rehabilitation

Closes 11/19/2026Opened 10/16/2026

Virginia Institute of Marine Science·Virginia

66% match

VIMS CONSTRUCT R/V VIRGINIA (RVVA) BERTHING

Closes 11/11/2026Opened 10/9/2026

U.S. Department Of Defense·Washington

66% match

Shipyard Infrastructure Optimization Program Multi-Mission Dry Dock, Multiple Award Construction Contract

Closes 12/1/2026Opened 9/30/2026

City of Long Beach·California

66% match

R-7307 Alamitos Bay Berth 1 And 2 Dock Replacement

Closes 11/19/2026Opened 10/8/2026

Port of Los Angeles Harbor Department·California

66% match

Pre-Development Agreement Marine Container Terminal Pier 500

Closes 12/10/2026Opened 10/1/2025

New York City Department of Parks & Recreation·New York

65% match

M289-120M East River Esplanade E36-38 St Seawall Reconstruct

Closes 11/2/2026Opened 9/21/2026

U.S. Department Of Defense·Texas

65% match

FY27 Texas City Ship Channel Main Channel and Turning Basin

Closes 11/7/2026Opened 10/28/2026

Quonset Development Corporation·Rhode Island

65% match

RI Fast Ferry Site Work - Construction

Closes 11/17/2026Opened 10/28/2026

Massachusetts Bay Transportation Authority·Massachusetts

65% match

IFB 126-26 Widett Layover Facility - 136 RE Rail

Closes 11/5/2026Opened 9/24/2026

Jacksonville Port Authority·Florida

65% match

BLOUNT ISLAND MARINE TERMINAL HANJUNG CRANE #8841 REFURBISHMENT

Closes 11/17/2026Opened 10/15/2026

Port of Stockton·California

65% match

Job Order Contracting: Marine Construction

Closes 11/19/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

65% match

(6) Decommissioned Marine Hulls

Closes 11/6/2026Opened 10/30/2026

U.S. Department Of Homeland Security·Florida

65% match

DOCK-SIDE (DS): CGC RELIANCE DS FY27

Closes 11/6/2026Opened 10/22/2026