The U.S. Coast Guard is seeking sources capable of providing drydock repairs to the USCGC HADDOCK (WPB-87347). The scope of work includes various tasks such as hull plating, ultrasonic testing, and propulsion shaft renewals. The period of performance is anticipated to be 91 calendar days, with a start date of 03 November 2026 and end date of 02 February 2027.
The key work items and scope of work for this project are:
• Hull Plating (Side Scan), Ultrasonic Testing
• Ultrasonic Thickness Measurements, Perform
• U/W Body, Preserve, 100 Percent
• Hull Plating Freeboard, Preserve, 100 Percent
• Tank, Dirty Oil, Clean and Inspect
• Tank, Oily Water, Clean and Inspect
• Tanks, MP Fuel Service, Clean and Inspect
• Decks, Exterior (Main Deck), Preserve
• Superstructure, Preserve, 100 Percent
• Capastic Fairing, Depth Sounder, Renew
• Watertight Closures, Assess
• Mast, Preserve (“100%”) – Contractor Interference Removal
• Main Engine/Reduction Gear, Realign
• Intermediate Water-Lubricated Propulsion Shaft Bearings, Renew
• Aft Water-Lubricated Propulsion Shaft Bearings, Renew
• Intermediate Bearings Carriers, Renew
• Aft Bearings Carriers, Renew
• Propulsion Shafts, Renew
• Stern Tube Interior Surfaces, Preserve, 100 Percent
• Propellers, Renew
• Electrical Power Distributions System, Thermographic Inspection, 450 VAC and Below
• Fathometer Transducer, Renew
• Speed Log, Skin Valve, Renew
• Ventilation System, Engine Room Supply and Exhaust Fan Assemblies, Clean and Inspect
• Ducting, HVAC System, Clean
• Sea Water System, Perform Maintenance
• Rudder Assemblies, Renew
• Stern Launch Door, Remove, Inspect and Reinstall
• Grey Water Holding Tanks, Clean and Inspect
• Sewage Holding Tanks, Clean and Inspect
• Grey Water Piping, Clean and Flush
• Sewage Piping, Clean and Flush
• Cathodic Protection/Zinc Anodes, Renew
• Drydock
• Temporary Services, Provide – Cutter
• Sea Trial Performance, Support, Provide
• Soft Patches, Remove and Inspect
• Windows, Pilothouse, Renew
• Cable Stand-offs, Mast, Renew
• Seawater Cooling Piping/Valves, Renew
• Fuel System Piping/Valves, Renew
• Jack Staff and/or Stanchion, D-Rings and Pigtails, Renew
• Interior Deck Covering System and Jointer Deck, Renew
• Main Mast, Modify