The Veterans’ Home of Wyoming – 1941 Building Laundry HVAC Upgrade Project involves the demolition of identified materials and existing HVAC ductwork, installation of new HVAC equipment, ductwork, and metal stud framed enclosure walls around the existing dryer units, and minor exterior concrete work. The project was rejected due to being over budget. The bid documents and rejection letter provide more information about the project.
• The project was scheduled to be completed by November 30, 2021.
• A mandatory pre-bid meeting was conducted on July 27, 2021.
• The bid documents were available on the Public Purchase website.
• A bid security of 10% of the total bid price was required, and a 100% performance and payment bond of the accepted bid was also required.