This contract is for the complete replacement of the existing cooling tower serving the ice‑rink chilled‑water system at Worcester’s DCU Center, including associated condenser‑water piping, electrical wiring, VFDs, and related controls. The project is a public‑works sealed‑bid solicitation issued by the City of Worcester and awarded to a single HVAC contractor. The scope mandates compliance with prevailing‑wage, safety, MWBE, and REO requirements, as well as a strict substantial‑completion deadline of mid‑September 2025.
• Replace the south‑roof cooling tower, install new 40 HP and 7.5 HP motor drives, new 2″ conduit, VFD bypass, OSHA‑compliant ladder/cage, and tapered discharge hood.
• Perform associated mechanical, electrical, and plumbing work (interior/exterior 10‑in. CS and 8‑in. CR piping with insulation and jacketing).
• All work must meet HVAC, building‑code, and city‑specific noise and environmental standards, with weekly certified‑payroll and safety reporting.