The City of Worcester’s Department of Public Works commissioned a full‑service design‑build installation of a 4,000‑gal above‑ground storage tank (AST) and associated fuel‑distribution infrastructure at the Moy Ranch facility. The scope includes professional‑engineer‑stamped design, site grading, concrete pad construction, asphalt paving, custom stairway fabrication, installation of two Great Plains G‑PRO fuel dispensers with SmartFill, electrical conduit work, re‑programming of the existing Veeder‑Root monitoring system, fire‑suppression equipment, and comprehensive as‑built documentation. The contract is a sealed‑bid, lump‑sum award with a 5 % bid deposit requirement and a 120‑day performance schedule once executed.
• Civil works: regrading, erosion‑control, 10 × 35 ft reinforced concrete pad and 30 × 24 ft fuel‑island pad.
• Mechanical/Electrical: custom AST, dual‑compartment fuel system, pumps, conduit, lighting, and monitoring instrumentation.
• Compliance: PE‑stamped design, prevailing‑wage adherence, OSHA safety training, MWBE participation goals, and extensive insurance/bonding requirements.