This contract awards the City of Madison the design‑and‑construction of a well‑to‑golf‑course water transfer system at Yahara Hills Golf Course. The work consists of installing an 8‑inch HDPE mainline, providing a resilient wedge valve and an inline check valve, and performing all necessary field‑locating, utility protection, and tie‑in coordination. The prime contractor, Parisi Construction, LLC, will be responsible for the overall delivery, while subcontractors (e.g., Tri‑State Directional Drilling) will handle specialized tasks such as directional drilling and landscaping. The contract is valued at $382,000 and follows a lump‑sum pricing structure.
• Scope: 8 in. HDPE pipe installation, valve supply & installation, utility coordination.
• Value: $382,000 total (mainline $355k, valve $14k, check valve $13k).
• Timeline: Estimated start 5 April 2026; bid opened 19 March 2026; award to Common Council 21 April 2026.