Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Wyoming guideWyoming Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Wyoming
  4. ›Construction
  5. ›BOULDER REARING STATION FLOOD CONTROL PROJECT

Awarded contract·State of Wyoming·Wyoming

BOULDER REARING STATION FLOOD CONTROL PROJECT

Won by MW Construction, Inc.$1.3MSingle Award
Contract source

Awarded vendors

  • MW Construction, Inc.

Description

The Boulder Rearing Station Flood Control Project involves the construction of a wetwell and levee. The project was bid on by MW Construction, Inc., but their bid was rejected due to being over budget. The project is located in Wyoming, and the bidding process was managed by the State of Wyoming. The key features of the project include a base bid of $1,318,418.75 and a mandatory pre-bid meeting. The project also involves the submission of proposals in PDF format only, and the acceptance of certain documents is required. Some of the key documents associated with the project include the bid bond response information form, the specs for the Boulder Rearing Station, and the geotech final report. • The project is located in Wyoming • The bidding process was managed by the State of Wyoming • The project involves the construction of a wetwell and levee • The base bid was $1,318,418.75 • The pre-bid meeting was mandatory • Proposals must be submitted in PDF format only • Certain documents must be accepted as part of the bidding process

Attached files

Key dates

Last updated

Details

Award type
Single Award
Industry
Construction
NAICS
237990
Solicitation №
01.02.04

Contract value

$1,318,419

Based on the provided information, the estimated value of the contract is around $1,318,418.75, which is the base bid submitted by MW Construction, Inc. However, this bid was rejected due to being over budget, so the actual contract value may be lower. The project involves the construction of a wetwell and levee, which are significant infrastructure components, and the cost of such projects can vary widely depending on factors such as materials, labor, and location. Therefore, the estimated value of the contract should be taken as a rough estimate rather than a precise figure.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Washakie County Conservation District·Wyoming

Top match · 67%

Big Horn River Bank Stabilization Project

Closes 12/1/2026Opened 10/29/2026

U.S. Department Of Defense·Louisiana

65% match

Flood Control, Amite River Tributaries, Louisiana, Comite River Basin, Comite River Diversion Project, Bayou Baton Rouge Rock Chute, East Baton Rouge Parish, Louisiana

Closes 2/6/2027Opened 11/5/2024

Massachusetts Town of Bolton·Massachusetts

65% match

Earthen Dam Restoration at Bowers Spring Conservation Area

Closes 11/17/2026Opened 10/13/2026

Manatee County - Purchasing Division·Florida

65% match

MUSGRAVE RANCH ROAD FLOODPLAIN COMPENSATION

Closes 11/20/2026Opened 10/15/2026

U.S. Department Of Transportation·Washington

65% match

WA NP OLYM 12(8), Hurricane Ridge Rockfall Mitigation MP 9.4

Closes 11/13/2026Opened 9/30/2026

City of Colorado Springs·Colorado

65% match

Cottonwood Creek Stabilization Academy to Union

Closes 11/9/2026Opened 10/9/2026

U.S. Department Of Agriculture·Utah

64% match

Yellow Lake Disaster Relief Project – Watershed / Uinta-Wasatch-Cache NF

Closes 11/9/2026Opened 10/30/2026

U.S. Department Of Transportation·Washington

64% match

WA NP OLYM 12(8), Hurricane Ridge Rockfall Mitigation MP 9.4

Closes 11/4/2026Opened 9/30/2026

Department of Natural Resources·Minnesota

64% match

State Fair Fire Prevention Building Drainage Correction

Closes 11/17/2026Opened 10/29/2026

City of Anderson·South Carolina

64% match

Branchcliff Lane Streambank Stabilization

Closes 11/2/2026Opened 10/12/2026

U.S. Department of Homeland Security - FEMA·United States of America

64% match

Fiscal Year 2024 Flood Mitigation Assistance Swift Current

Closes 12/30/2026Opened 5/30/2024

City of Coronado·California

64% match

First Street Stormwater Pump Station Flood Relief Project

Closes 11/9/2026Opened 9/23/2026

U.S. Department of Homeland Security - FEMA·United States of America

64% match

Fiscal Year 2024 Flood Mitigation Assistance

Rolling / TBD closeOpened 1/6/2025

NYS OGS Design & Construction - Construction Contractors·New York

64% match

Rehabilitate Floodwalls – Project 46196‑C (Cheektowaga, NY)

Closes 11/18/2026Opened 10/13/2026

City of Yuba City·California

64% match

NORTH GILSIZER DETENTION BASIN IMPROVEMENTS PROJECT

Closes 11/5/2026Opened 10/15/2026

City of Cedar Rapids·Iowa

63% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

U.S. Department Of The Interior·Nevada

63% match

Y--BASSIE SPRING IMPROVEMENT PROJECT

Closes 11/9/2026Opened 9/25/2026

West Virginia Department of Environmental Protection·West Virginia

63% match

AML- Bridgeport (Tomes) Landslide

Closes 11/4/2026Opened 10/19/2026

California Grants·California

63% match

Dam Safety and Climate Resilience Local Assistance

Rolling / TBD closeOpened 5/19/2026

County of Santa Cruz·California

63% match

Upper East Zayante PM 1.18 Storm Damage Repair Project

Closes 11/12/2026Opened 10/15/2026

City of Cedar Rapids·Iowa

63% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

U.S. Department Of The Interior·Utah

63% match

F--Post-Flood Cleanup and Disaster AbatementSand Is

Closes 11/4/2026Opened 10/30/2026

U.S. Department Of Defense·Texas

63% match

FY26 HARLINGEN PLACEMENT AREA (PA)13 AND 10 IMPROVEMENTS

Closes 9/10/2027Opened 9/10/2026

City of Cedar Rapids·Iowa

63% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

St. Louis County, MN - Purchasing Division·Minnesota

63% match

Stream Mitigation Bank Development

Closes 11/9/2026Opened 10/19/2026