Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Construction
  5. ›CLEARMONT WATER RECLAMATION FACILITY TWO STEEL TANKS…

Awarded contract·City of Palm Bay·Florida

CLEARMONT WATER RECLAMATION FACILITY TWO STEEL TANKS REFURBISHMENT AND REPLACEMENT OF CLARIFIER WALKWAY BRIDGE AT WASTERWATER TREATMENT PLANT

$1.1MSingle Award
Contract source

Description

The City of Palm Bay is seeking a contractor to refurbish two steel tanks and replace the clarifier walkway bridge at the Wastewater Treatment Plant. The work will be divided into three phases and will include modifications to the facilities and associated process equipment. The contractor will be required to maintain all required documentation and submit all required documentation to the City. The contractor will also be required to protect all electrical and instrumentation equipment located within the construction area from any damage during the duration of the project. • The work will include headworks modifications, steel ring tank modifications, and tank coatings. • The contractor will be required to meet all Federal, State, County, and City safety and environmental requirements. • The contractor will be required to have a trained competent person on site during any confined space entry work or work where fall protection is required. • The engineer's estimate for the project is between $1M and $1.2 Million.

Attached files

Key dates

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
236220
Solicitation №
35-0-2014

Contract value

$1,100,000

Based on the engineer's estimate, the value of this contract is likely between $1M and $1.2 Million. This estimate is likely based on the scope of work, which includes the refurbishment of two steel tanks and the replacement of a walkway bridge. The actual value of the contract may vary depending on the bids received and the final scope of work.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

Top match · 72%

Rehabilitate Sewage Treatment Plant – Parker Dam State Park – Huston Township, Clearfield County, Pennsylvania

Closes 12/3/2026Opened 10/28/2026

New York City Department of Environmental Protection·New York

72% match

82627B0022-BEDC-NR-107 Structural improvements to the North River WRRF

Closes 12/9/2026Opened 10/22/2026

City of Long Prairie·Minnesota

72% match

Long Prairie, City of Water Treatment Plant Rehabilitation 25X.138024

Closes 11/18/2026Opened 10/29/2026

City of Clearwater·Florida

71% match

Wastewater Collections Point Repair and Improvements

Closes 11/5/2026Opened 9/23/2026

City of Hollywood·Florida

71% match

Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261

Closes 11/25/2026Opened 10/20/2026

City of Rosenberg·Texas

71% match

Wastewater Treatment Plant Phase 2 - Collection System Rehabilitation

Closes 11/19/2026Opened 10/26/2026

City of Holly Grove·Arkansas

71% match

City of Holly Grove Water System Improvements – Water Tank Rehabilitation and Plant Building Modification

Closes 11/18/2026Opened 10/25/2026

City of Chicago·Illinois

71% match

Eugene Sawyer Water Purification Plant (ESWPP) Low Lift Pump Building, Chemical Building, and Garage Roof Replacement

Closes 12/18/2026Opened 10/12/2026

City of Hollywood·Florida

70% match

Water Treatment Plant MS/RO Chemical Area Recoating; Project No. 25-4262A

Closes 12/3/2026Opened 10/26/2026

City of Hollywood·Florida

70% match

Water Treatment Plant Maintenance Package 'B'; Project No. 25-4262

Closes 12/3/2026Opened 10/26/2026

City of Charlotte·North Carolina

70% match

McDowell Creek Wastewater Treatment Plant Clarifier & Pumping Station

Rolling / TBD closeOpened 1/1/2027

Western Virginia Water Authority·Virginia

70% match

ITB - SPRING HOLLOW WTF CLEARWELL

Closes 11/17/2026Opened 10/15/2026

U.S. Department Of Defense·United States of America

69% match

Waste Water Treatment Plant Services

Closes 11/23/2026Opened 10/12/2026

Eden Prairie Schools·Minnesota

69% match

Transportation Building Fuel Tanks Replacement

Closes 11/24/2026Opened 10/29/2026

New York City Department of Environmental Protection·New York

69% match

82627B0022-BEDC-NR-107: Structural improvements to the North River WRRF

Closes 12/9/2026Opened 10/22/2026

Eastern Municipal Water District·California

69% match

Purified Water Replenishment SJV Advanced Water Purification Facility

Closes 11/19/2026Opened 8/25/2026

Upper Occoquan Service Authority·Virginia

69% match

UOSA IFB 27-02 P2NR+ Construction

Closes 11/4/2026Opened 8/24/2026

City of Douglas·Wyoming

69% match

Sanitary Sewer and Misc WWTP Improvements Project

Closes 11/3/2026Opened 10/16/2026

U.S. Department Of Defense·Mississippi

69% match

Arkabutla Lake Water Plant Rehab and Pre-fabricated Metal Building Installation

Closes 11/6/2026Opened 10/21/2026

City of Bellevue·Washington

69% match

2027 Phase 1 Water Main Replacement

Closes 11/12/2026Opened 10/22/2026

City of Rosenberg·Texas

69% match

Water Plant No 4 - Recoat Elevated Storage Tank

Closes 11/19/2026Opened 10/26/2026

Chennault International Airport Authority·Louisiana

69% match

Firewater Pumphouse #2 (FWPH) Firewater Storage Tanks 1 & 2 Repairs, Recoat, and Controls Upgrade (Project #2026-03)

Closes 11/17/2026Opened 10/13/2026

City of Ontario·California

69% match

Pure Water Ontario Advanced Water Purification Facility (UT1091)

Closes 11/13/2026Opened 10/15/2026

Contra Costa Water District·California

69% match

Bollman Water Treatment Plant Improvements

Closes 12/10/2026Opened 10/29/2026

DOC - Architecture and Engineering·Virginia

69% match

Greensville Recoating and Repairs to Water Tank 799-10887-1284

Closes 11/4/2026Opened 10/2/2026