The City of Roseville is soliciting bids for the fabrication and delivery of a new substation control building as part of a substation rebuild project for Roseville Electric Utility. The contract was awarded to Schweitzer Engineering Laboratories, Inc. and Crown Technical Systems, with bids of $518,246.75 and $486,585.29, respectively. The scope of work includes the fabrication and delivery of the substation control building.
• The contract is for a substation control building as part of a substation rebuild project.
• The City of Roseville is the agency awarding the contract.
• The contract was awarded to two vendors: Schweitzer Engineering Laboratories, Inc. and Crown Technical Systems.
• The bids for the contract were $518,246.75 and $486,585.29, respectively.