The contract is for the plugging of 79 wells with one CIBP and 100' cement, and one well with two CIBP and three 100' cement plugs. The work includes pulling wells, spooling electric wire, cutting air and transducer lines, setting bridge plugs, filling holes with water, plugging per general plugging specifications, cutting off casing, capping wells, and removing surface and downhole equipment. The contract also includes equipment hourly rates for various services such as bit and scrapper/run, rig, wire spooler, coil tubing unit, and cement mixing and pumping.
• The contract was awarded to multiple vendors, including Continental Industries Field Services, Pluggin Along, LLC, WyoDak Energy Services, JTE Services, LLC, and MEGA Energy, LLC.
• The contract includes a mobilization and demobilization fee, but the amount is not specified.
• The contractor's equipment availability date is listed as 07/15/2020.
• The contract includes a third-party services re-bill charge, which ranges from 10% to 15% depending on the vendor.