This contract involves the design, supply, and construction of new headworks and electrical facilities for the Rocky Hill Water Pollution Control Facility (RHWPCF). The scope includes installing multi‑rake mechanical bar screens, aerated grit removal equipment, new electrical and instrumentation gear, and constructing a new headworks building plus a separate electrical building, together with all necessary support equipment and accessories. Bidders were required to attend a mandatory pre‑bid conference and site tour before submitting sealed bids, and the sealed bids were to be delivered to the Metropolitan District’s clerk’s office by early April 2024. The award was made in late June 2024.
• Construction of water‑treatment plant infrastructure (mechanical screens, grit removal, electrical building).
• All labor, equipment, permits, and related costs are included; vendors must follow Section 01010 “Summary of Work”.
• Mandatory pre‑bid conference (Feb 22 2024) and site tour at 80 Goff Brook Lane, Rocky Hill, CT.
Attached files
The award documents live at the source — open the contract source above to download them.