The contract is for the replacement of a septic system at 981 Milo White, Akron, Ohio 44312. The work includes the installation of an NPDES-compliant aerobic treatment unit, meeting all aspects of the state's sewage treatment system rules. The contractor must also locate all water wells and ensure that the existing septic is pumped, crushed, and filled according to state and local code. The contract was awarded to Summit Excavating, Inc. for a total of $14,399.00.
• The contract includes the installation of a pump fail safe and a discharge point.
• The owner is responsible for all fees and permits.
• The contractor must provide a warranty for the work.
• The contract is subject to Davis Bacon wage rates.