The N Inglewood Pressure Zone Modification project involves the installation of approximately 240 lineal feet of 8” DI water main in an easement to connect the existing water mains. The project includes grading, tree removal, connections to the existing system, valves, air/vac assembly, and other appurtenances. The project will also include landscaping and surface restoration of private property and right-of-way after construction. Key aspects of the project include:
• Installation of 8” DI water main
• Grading and tree removal
• Connections to existing water mains
• Valves and air/vac assembly
• Landscaping and surface restoration
The project is located within the City of Sammamish, King County, Washington. The engineer's estimate for the project is $310,000.