University of Louisville seeks a turn‑key contractor to replace the existing cooling tower and air‑cooled chiller at Burhan’s Hall (Shelby Campus). The scope includes removal of the current cooling tower, installation of a new 216‑ton packaged air‑cooled scroll chiller, underground 8‑inch chilled‑water piping, new electrical fused disconnect, and full commissioning to be ready for the 2026 cooling season. The contractor must meet detailed mechanical, electrical, and control specifications, provide warranties, and comply with extensive university safety, environmental, and construction‑site procedures.
• Remove existing cooling tower and associated mechanical components.
• Supply and install a 216‑ton air‑cooled scroll chiller with all required accessories (piping, supports, insulation, valves, controls).
• Install new 8” underground chilled‑water lines and integrate with existing plant loops.
• Provide new electrical disconnect, routing, and BAS integration per university specifications.
• Complete all testing, commissioning, training, and documentation; meet substantial completion by 15 Apr 2026.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.