Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Arizona guideArizona Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Arizona
  4. ›Civil Engineering
  5. ›Design for Nebraska St. BikePed Bridge & Airport Wash…

City of Tucson·Arizona

Design for Nebraska St. BikePed Bridge & Airport Wash Greenway

Closes 11/18/2025$500k – $2MRequest for Qualification
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Tucson is seeking professional design, engineering, and public engagement services for a new bicycle and pedestrian bridge over Interstate 19, connecting the planned Nebraska Street Bicycle Boulevard to the Spectrum Mall and to the Chuck Huckelberry Loop shared-use path system. The consultant team will develop a design concept, prepare preliminary and final design plans, assist with public engagement, and prepare relevant environmental clearance documents. The project aims to support pre-construction tasks for the Airport Wash Greenway and construct a new bicycle and pedestrian bridge over I-19. Key services include bridge engineering, landscape architecture, civil engineering, public engagement, and environmental clearances. The consultant will work with the City of Tucson to refine and finalize the design concept, provide preliminary and final design services, and support the City with public engagement. • The project involves designing a new bicycle and pedestrian bridge over I-19, including bridge alignment, type, and materials. • The consultant will assist with public engagement, including developing a public engagement strategy and plan, building and maintaining a project website, and developing surveys and online interactive maps. • The project requires coordination with the Arizona Department of Transportation (ADOT) and compliance with Federal Highway Administration (FHWA) requirements. • The consultant will prepare relevant environmental clearance documents, including a Project Assessment document and National Environmental Policy Act (NEPA) documentation. • The project involves multiple disciplines, including civil engineering, landscape architecture, transportation planning, and environmental services.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Benjamin Elias(Senior Contract Officer)

[email protected]

(520) 508-4321

Key dates

Opened
10/27/2025
Questions due
11/10/2025
Pre-bid meeting
11/5/2025
Closes
11/18/2025

Last updated

Details

Type
Request for Qualification
Industry
Civil Engineering
NAICS
54133
Solicitation №
260115

Budget estimate

$500,000 – $2,000,000

Based on the scope of work, which includes designing a new bicycle and pedestrian bridge over I-19, and the fact that the project is funded through the USDOT Reconnecting Communities Pilot Planning Grant, the estimated budget for this project could be in the range of $500,000 to $2 million. This estimate is rough and based on the assumption that the project will require significant design, engineering, and public engagement services. The actual budget could be higher or lower, depending on the specific requirements of the project and the consultant's proposed scope of work.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Cobb County, GA·Georgia

Top match · 71%

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

City of Harrisonburg·Virginia

69% match

Northend Greenway (NEG) Brookside ITB (2027020-PW-B)

Closes 12/10/2026Opened 10/22/2026

City of Richmond·California

68% match

Richmond Greenway Bridge Project – Implementation Plan

Closes 11/19/2026Opened 10/19/2026

Minnesota Department of Transportation·Minnesota

67% match

260132 SP 5212-42

Closes 11/18/2026Opened 10/21/2026

Franklin County Board of County Commissioners·Florida

67% match

ITB- AIRPORT WEST HANGER DEVELOPMENT

Closes 12/14/2026Opened 10/28/2026

City of Cedar Rapids·Iowa

67% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Keene·New Hampshire

67% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

Georgia Cobb County Department of Transportation·Georgia

67% match

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

Minnesota Department of Administration·Minnesota

67% match

Minnesota Valley State Trail; Nine Mile Creek to Interstate 35W

Closes 11/17/2026Opened 10/15/2026

Massachusetts Department of Transportation·Massachusetts

67% match

608020 BOURNE Bridge Replacement, B-17-005, (ARF) (SAGAMORE BRIDGE), US 6 over the Cape Cod Canal,

Closes 5/27/2027Opened 3/23/2026

Massachusetts Department of Transportation·Massachusetts

67% match

616276 FOXBOROUGH-MIDDLEBOROUGH-NORTON FAP No. STP(BR-OFF)-004S(017)X Bridge Preservation along I-

Closes 11/3/2026Opened 9/21/2026

City of Cedar Rapids·Iowa

67% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

67% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Great Rivers Greenway·Missouri

66% match

GRG 2026-009-725I - Missouri Greenway: Monarch Chesterfield Levee Trail Signage Replacement Project

Closes 11/6/2026Opened 10/12/2026

Georgia Cobb County Department of Transportation·Georgia

66% match

Notice of Intent to Advertise - Design Build Services for the Chattahoochee River Trail Project

Closes 1/15/2027Opened 9/10/2026

County of Marin·California

66% match

MCP 2026-07 CASCADE CANYON TRAIL BRIDGE PROJECT

Closes 12/3/2026Opened 10/27/2026

City of Cedar Rapids·Iowa

66% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

66% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

MTA - NYC Transit (NYCT)·New York

65% match

Design Services for Travelers at the Bronx Whitestone (BW-9K) and Robert F. Kennedy (RK-9K) Bridges (State)

Closes 12/7/2026Opened 10/28/2026

Oregon Department of Transportation·Oregon

65% match

Boone Bridge Northbound Joint Replacement

Closes 11/10/2026Opened 10/21/2026

City of Cedar Rapids·Iowa

65% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Seattle·Washington

65% match

Roosevelt Way Preservation (FHWA)

Closes 11/4/2026Opened 10/7/2026

Lower Platte North Natural Resources District·Nebraska

65% match

LOWER PLATTE NORTH NATURAL RESOURCES DISTRICT WAHOO CREEK WATERSHED SITE 77

Closes 12/2/2026Opened 9/18/2026

City of Kearney·Missouri

65% match

Mack Porter Park Connector Shared Use Path - Kearney, MO

Closes 11/3/2026Opened 10/6/2026

Cherry Hill Township·New Jersey

65% match

2026 Downs Farm Bridge Re-Bid #1

Closes 11/10/2026Opened 10/27/2026