Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Mississippi guideMississippi Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Mississippi
  4. ›Construction
  5. ›Pedestrian Bridge Abutment Construction and Pre-Fabricated…

Mississippi City of Clarksdale·Mississippi

Pedestrian Bridge Abutment Construction and Pre-Fabricated Bridge Installation – Sunflower River Walk

Closes 5/15/2026$200k – $500kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Clarksdale, Mississippi is seeking bids for the construction of two concrete bridge abutments and the installation of a pre-fabricated bridge for the Sunflower River Walk. The project involves providing materials, labor, and equipment to construct the abutments and install the bridge. The deadline for submission of sealed written bids is May 15, 2026 at 1:30 p.m. • The project requires the construction of two concrete bridge abutments for an approximately 80 foot-long, 6 foot-wide pedestrian bridge. • The project also involves lifting and installing the Owner Provided pre-fabricated bridge onto the abutments and making final connections. • Detailed specifications and drawings for the pedestrian bridge abutment requirements are available at the City Clerk's office or can be obtained by contacting Maggie Lloyd at [email protected]. • The City reserves the right to reject any and all bids submitted, cancel the Request for Bids, or require additional information from any bidder.

Attached files

Contact

Laketha Covington(City Clerk)

[email protected]

(662) 621-8136

Key dates

Opened
5/11/2026
Pre-bid meeting
5/6/2026Mandatory
Closes
5/15/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
1428-20260422152859 Clarksdale

Budget estimate

$200,000 – $500,000

The budget for this project can be estimated based on the scope of work, which involves the construction of two concrete bridge abutments and the installation of a pre-fabricated bridge. The cost of materials, labor, and equipment will be significant factors in determining the budget. A rough estimate for the construction of a pedestrian bridge can range from $200,000 to $500,000, depending on the complexity of the project and the materials used. Therefore, the budget for this project can be estimated to be in the range of $200,000 to $500,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Recreation and Park Commission for the Parish of East Baton Rouge (BREC)·Louisiana

Top match · 69%

SB 1878 Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 10/1/2026

City of Columbia·Missouri

69% match

Replacement of Bridge 9 on MKT Trail

Closes 11/10/2026Opened 9/29/2026

BREC·Louisiana

69% match

SB 1878 Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 9/30/2026

Delaware River Joint Toll Bridge Commission·New Jersey

68% match

Portland‑Columbia Toll‑Supported Pedestrian Bridge Rehabilitation

Closes 11/5/2026Opened 10/1/2026

Louisiana Recreation and Park Commission for the Parish of East Baton Rouge·Louisiana

68% match

Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 9/30/2026

Connecticut Town of Cheshire·Connecticut

68% match

2627-05 Mixville Park Pedestrian Bridge

Closes 11/3/2026Opened 10/13/2026

Minnesota Department of Administration·Minnesota

68% match

Minnesota Valley State Trail; Nine Mile Creek to Interstate 35W

Closes 11/17/2026Opened 10/15/2026

Division of Highways·North Carolina

67% match

U.S. Highway 17 Pedestrian Crossing

Closes 11/19/2026Opened 10/27/2026

County of Marin·California

67% match

MCP 2026-07 CASCADE CANYON TRAIL BRIDGE PROJECT

Closes 12/3/2026Opened 10/27/2026

Cobb County, GA·Georgia

67% match

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

City of Alexandria·Louisiana

67% match

Masonic Drive Sidewalk - Hynson Bayou Pedestrian Bridge Replacement

Closes 12/1/2026Opened 10/23/2026

City of Cedar Rapids·Iowa

66% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

66% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Ormond Beach - Purchasing Office·Florida

66% match

Main Trail Bridge Repair

Closes 11/6/2026Opened 9/27/2026

Cobb County·Georgia

66% match

Chattahoochee River Trail – FM SR 139 to Nickajack Creek – Phase II Public Notice of Advertisement

Closes 4/8/2027Opened 9/21/2026

City of Cedar Rapids·Iowa

66% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Sacramento·California

66% match

Pedestrian Crossing at R Street and 29th/30th Streets

Closes 11/4/2026Opened 9/30/2026

County of Sacramento·California

66% match

SMF Pedestrian Walkway - Riparian Public Art Installation Project

Closes 11/19/2026Opened 10/26/2026

City of Keene·New Hampshire

66% match

Ashuelot Rail Trail Bridge (KSC) Rehab

Closes 11/24/2026Opened 10/21/2026

Connecticut Town of Cheshire·Connecticut

66% match

2627-05 Mixville Park Pedestrian Bridge

Closes 11/3/2026Opened 10/13/2026

CPPJ Road, Bridge, & Utility·Louisiana

66% match

Garrie Cut‑Off Bridge Replacement Project – Calcasieu Parish Bridge Replacement

Closes 11/17/2026Opened 10/20/2026

Georgia Cobb County Department of Transportation·Georgia

66% match

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

City of Palm Springs·California

66% match

East Palm Canyon Bridge Project

Closes 11/20/2026Opened 10/20/2026

City of Cedar Rapids·Iowa

65% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

65% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026