Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Alaska guideAlaska Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFIRFI Meaning: What Is an RFI?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Alaska
  4. ›Construction
  5. ›NOTICE OF FLOOD ENCROACHMENT & INTENT TO BEGIN ENGINEERING…

Alaska Department of Transportation and Public Facilities·Alaska

NOTICE OF FLOOD ENCROACHMENT & INTENT TO BEGIN ENGINEERING AND ENVIRONMENTAL STUDIES: Moose Creek Bridge and Moose Creek

Closes 10/23/2026$5M – $15MRequest for Information
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Alaska Department of Transportation and Public Facilities (DOT&PF) is announcing its intent to begin engineering and environmental studies for the reconstruction of the Moose Creek Bridge on Petersville Road (MP 7.0). The project aims to restore safe, reliable transportation across Moose Creek, upgrade the bridge to current structural, hydraulic, and safety standards, and address minor floodplain encroachments. Scope of work includes bridge reconstruction, road surface lifting, paving, roadway realignment, shoulder improvements, signing and striping, roadside hardware, brush clearing, drainage features, embankment protection, and stream channelization. Comments on the proposal must be submitted by October 23 2026, and construction is anticipated to start in spring 2030. • Bridge replacement and associated roadway upgrades in the Central Region of Alaska • Compliance with FHWA, NEPA, Section 106, and various environmental statutes • Public comment period ends 10/23/2026 • Project location: Moose Creek, within the 100‑year floodplain (FEMA Panel 02170C2750F) • Primary contact: Heidi Zimmer, Regional Environmental Manager (email: [email protected])

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Heidi Zimmer(Regional Environmental Manager)

[email protected]

(907) 269-0473

Key dates

Opened
9/24/2026
Questions due
10/23/2026
Closes
10/23/2026

Last updated

Details

Type
Request for Information
Industry
Construction
NAICS
237310
Solicitation №
Petersville Rd MP 7.0, Moose Creek Bridge Reconstruction

Budget estimate

$5,000,000 – $15,000,000

No specific contract value is disclosed. Based on typical rural bridge reconstruction projects in Alaska, costs can range from a few million dollars for a modest span to over ten million for more complex structures, including engineering, environmental mitigation, and roadway upgrades. Assuming a mid‑size bridge and the extensive ancillary work listed, a reasonable estimate would be between $5 million and $15 million. Factors influencing the final amount include bridge length, material choices, site accessibility, floodplain mitigation, and inflation adjustments for a 2030 start date.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

County of Ontario·New York

Top match · 74%

Geneva Drinking Water Plant Floodplain Restoration Project Feasibility Study

Closes 12/15/2026Opened 10/15/2026

City of Cedar Rapids·Iowa

74% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

74% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

73% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

73% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

73% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

73% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

73% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Cobb County·Georgia

72% match

Chattahoochee River Trail – FM SR 139 to Nickajack Creek – Phase II Public Notice of Advertisement

Closes 4/8/2027Opened 9/21/2026

City of Seattle·Washington

72% match

Outreach Event: Cascades Dam Tour

Closes 2/26/2027Opened 9/30/2026

East Bay Municipal Utility District·California

71% match

Mokelumne River Floodplain Habitat Restoration Project

Closes 11/6/2026Opened 9/21/2026

City of Cedar Rapids·Iowa

71% match

8th Ave Bridge Replacement & Floodwalls Construction Engineering & Inspection Services

Closes 11/10/2026Opened 10/20/2026

Cobb County, GA·Georgia

71% match

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

Georgia Cobb County Department of Transportation·Georgia

70% match

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

NYS Ontario County·New York

70% match

Geneva Drinking Water Plant Floodplain Restoration Project Feasibility Study

Closes 12/15/2026Opened 10/16/2026

Massachusetts Department of Fish and Game·Massachusetts

70% match

Notice of Funding Opportunity - FY27 Transitional Crossing Site Selections

Closes 11/3/2026Opened 10/27/2026

County of Marin·California

70% match

MCP 2026-07 CASCADE CANYON TRAIL BRIDGE PROJECT

Closes 12/3/2026Opened 10/27/2026

U.S. Department Of Transportation·Wyoming

70% match

WY NP YELL 15(2), Madison River Bridge

Closes 7/1/2028Opened 7/28/2026

City of Casper·Wyoming

69% match

Glendale Detention Pond Improvements, project 25-044

Closes 11/6/2026Opened 10/16/2026

Laramie Rivers Conservation District·Wyoming

69% match

Laramie River - Hart Ranch Restoration

Closes 11/8/2026Opened 8/27/2026

Assumption Parish Police Jury·Louisiana

69% match

Request for Qualifications: Engineering and Planning Services for Amelia Levee – Bayou Boeuf Project (TE-0192)

Closes 11/2/2026Opened 10/6/2026

Nevada County·California

69% match

Rock Creek Road at Rock Creek Bridge – Engineering Design Services

Closes 11/30/2026Opened 10/15/2026

Massachusetts Town of Spencer·Massachusetts

69% match

Engineering Peer Review Proposals

Closes 12/3/2026Opened 10/30/2026

U.S. Department Of The Interior·Wyoming

69% match

Z--YELL 338223 - Bridge Preservation

Closes 11/6/2026Opened 10/7/2026

Delaware Valley Regional Planning Commission·Pennsylvania

69% match

Schuylkill River Pedestrian and Cyclist Bridge Feasibility Study (TCDI Project Category 5 – Transportation and Infrastructure Planning)

Closes 12/4/2026Opened 10/30/2026