East Bay Municipal Utility District (EBMUD) is seeking a qualified professional engineering firm to design, permit, and provide construction‑phase engineering support for a new plant‑wide emergency standby generator system at its Main Wastewater Treatment Plant. The scope includes data collection, preliminary and detailed design of two medium‑voltage (12.47 kV) diesel generators, fuel storage, integration with existing switchgear, CEQA and air‑quality permitting, bid‑support services, and on‑site construction‑phase engineering through 2030. The contract is cost‑reimbursement with a not‑to‑exceed ceiling (amount not disclosed) and requires a senior engineering team with extensive medium‑voltage generator experience.
• Design of two 3 MW medium‑voltage emergency generators, fuel tanks, and tie‑in to existing sub‑stations.
• Full lifecycle services: data collection, preliminary & final design, permitting (CEQA, BAAQMD), bid‑phase technical support, and on‑site construction engineering through commissioning.
• Mandatory qualifications: ≥10 years experience, ≥3 similar medium‑voltage generator projects (> $500 k each), California PE licenses, and a third‑party SME for controls/automation.
• Timeline: RFP issued July 10 2026, pre‑proposal conference July 29 2026, submission deadline August 14 2026, award Oct 27 2026, design work Oct 2026‑Feb 2028, construction‑phase support Jul 2028‑Jun 2030.