The San Jacinto Unified School District is modernizing its Nutrition Services facilities, including a full central‑kitchen renovation and associated building upgrades. The project covers site work, structural concrete, steel framing, roofing, interior finishes, food‑service equipment installation, and comprehensive mechanical, electrical, plumbing, and fire‑suppression systems. Bidders must be pre‑qualified for a minimum of $1.5 million, attend a mandatory pre‑bid conference, and submit a lump‑sum bid. Key documents such as the project manual, DSA‑approved drawings, and several addenda detail the extensive scope.
• Demolition of existing kitchen and warehouse spaces, construction of new central kitchen building with loading docks, locker rooms, training rooms, and backup generator.
• Installation of HVAC, MEP, fire‑suppression, and extensive food‑service equipment (refrigeration racks, exhaust hoods, make‑up‑air fans, etc.).
• Interior finishes including slip‑resistant flooring, stainless‑steel wall panels, ADA‑compliant restrooms, and specialized flooring for kitchen areas.
• Required compliance with Division of the State Architect (DSA) standards, prevailing‑wage rules, bonding, insurance, and strict construction‑hour limits.