Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›Upcoming Procurement: Chaboya Yard Zero-Emission Bus (ZEB)…

Santa Clara Valley Transportation Authority·California

Upcoming Procurement: Chaboya Yard Zero-Emission Bus (ZEB) Charging Infrastructure Project

Closes 7/15/2026$10M – $20MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Santa Clara Valley Transportation Authority (VTA) is procuring the Chaboya Yard Zero-Emission Bus (ZEB) Charging Infrastructure Project using the Construction Manager/General Contractor (CMGC) project delivery method. The project involves the installation of 55 overhead inverted pantograph type dispensers for Battery Electric Buses (BEBs), canopy structures for bus parking and overhead dispensers, and site modifications for a new electrical service and electrical distribution infrastructure. The project aims to support VTA's goal of operating a 100% Zero Emission fleet by 2040. Some key aspects of the project include: • Installation of BEB charging infrastructure with 55 overhead inverted pantograph type dispensers • Installation of canopy structures for bus parking and overhead dispensers with capability to install solar panels • Site modifications for a new electrical service and electrical distribution infrastructure • Maintenance of existing space allocations for bus driver training and contingency fleet operations throughout construction and post-installation phases • Design services to accommodate future solar panel installations and hydrogen fueling The project is currently at the 35% Preliminary Design stage, and VTA is preparing the procurement documents for this CMGC project.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Chris Valle

[email protected]

(408) 321-7127

Key dates

Opened
6/15/2026
Closes
7/15/2026
Duration
7 months

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
238210
Solicitation №
C26069-Upcoming Proc

Budget estimate

$10,000,000 – $20,000,000

The budget for this project can be estimated based on the scope of work, which includes the installation of 55 overhead inverted pantograph type dispensers, canopy structures, and site modifications for a new electrical service and electrical distribution infrastructure. Assuming an average cost of $100,000 per dispenser, the total cost for the dispensers would be $5,500,000. Adding the costs of canopy structures, site modifications, and other infrastructure, the total project cost could be in the range of $10 million to $20 million. Therefore, the budget for this project could be estimated to be between $10,000,000 and $20,000,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Kansas City Area Transportation Authority·Missouri

Top match · 79%

Design-Build Battery Electric Bus (BEB) Charging Infrastructure and Canopy

Closes 12/29/2026Opened 11/16/2026

Escambia County·Florida

74% match

CDBG-DR ECAT Bus Shelter Manufacturing Project HS018 - Re-Solicit

Closes 11/30/2026Opened 10/30/2026

Louisiana Capital Area Transit System (CATS)·Louisiana

72% match

Bus Shelters

Closes 11/16/2026Opened 10/14/2026

Port of Long Beach·California

72% match

HD-S3203 HARBOR FLEET ZERO EMISSIONS INFRASTRUCTURE

Closes 11/17/2026Opened 10/8/2026

Missouri Department of Transportation (MoDOT) Northeast District·Missouri

72% match

Heated Asphalt Storage Tank

Closes 11/2/2026Opened 10/27/2026

Maryland City of Gaithersburg·Maryland

72% match

Installation of New Bus Shelters and Associated Site Improvements

Closes 12/9/2026Opened 10/21/2026

SC Department of Education·South Carolina

72% match

Electric Bus Charging Stations - Newberry - Paving

Closes 11/5/2026Opened 10/13/2026

Pennsylvania Philadelphia Regional Port Authority·Pennsylvania

71% match

RFP for EV Forklifts and Charging Stations

Closes 11/17/2026Opened 10/22/2026

City of Pueblo·Colorado

71% match

West Side Improvements - Bus Stops Package 1

Closes 11/4/2026Opened 9/22/2026

Michigan Madison District Public Schools·Michigan

71% match

MDPS Bus Parking Lot

Closes 11/19/2026Opened 10/29/2026

Department of Education·South Carolina

71% match

Electric Bus Charging Stations - Union - Paving

Closes 11/5/2026Opened 10/12/2026

Victor Valley Transit Authority·California

71% match

Building Modifications for Hydrogen Fuel Cell Bus Maintenance

Closes 11/19/2026Opened 10/9/2026

Massachusetts Department of Transportation·Massachusetts

71% match

613689 CAMBRIDGE FAP No. HPP/STP-003E(014)X Neighborhood Electric Vehicle Charging Infrastructure

Closes 11/10/2026Opened 9/14/2026

City of Rapid City·South Dakota

71% match

Transit Bus Shelters

Closes 11/10/2026Opened 10/19/2026

Maryland Baltimore County Public Schools·Maryland

71% match

DEI-600-27 Windsor Mills Bus Facility - AST and Fuel Dispenser Upgrade (Revised)

Closes 11/4/2026Opened 10/8/2026

U.S. Department Of Defense·U.S. Armed Forces – Pacific

71% match

Vehicle Maintenance Shop, Kadena Air Base

Closes 10/31/2026Opened 9/18/2026

Public Service Company of New Mexico·New Mexico

71% match

RFI: Transportation Electrification Program (TEP)

Closes 11/6/2026Opened 9/1/2026

North Carolina City of Raleigh·North Carolina

70% match

Wake BRT New Bern Avenue Construction Package 3

Closes 11/16/2026Opened 9/25/2026

Ohio Department of Natural Resources·Ohio

70% match

PWC Hocking Hills Winter Hike 2027 Busing

Closes 11/13/2026Opened 10/23/2026

City of Galesburg·Illinois

70% match

RFB - Dump Truck Body, Snow Plow, Salt Spreader for the Park Division

Closes 11/4/2026Opened 10/14/2026

Capital Area Transit System·Louisiana

70% match

Bus Stop Shelters

Closes 11/16/2026Opened 10/14/2026

U.S. Department Of Defense·United States of America

70% match

P210 ELECTRIC POWER PLANT AND ELECTRICAL DISTRIBUTION SYSTEM AT CHABELLEY AIRFIELD, DJIBOUTI

Closes 11/16/2026Opened 10/21/2026

DGS Division of Purchases and Supply·Virginia

70% match

Vehicle: Low Floor BOC - Transit Cutaway 13 to 21 Passenger

Closes 11/12/2026Opened 9/4/2026

Toledo Area Regional Transit Authority·Ohio

70% match

Battery Electric Bus Maintenance Training & Apprenticeship Program

Closes 11/19/2026Opened 10/22/2026

Central Ohio Transit Authority (COTA)·Ohio

70% match

COTA Bus Passenger Shelter Cleaning Services

Closes 11/9/2026Opened 10/9/2026