The City of Redding is seeking bids to replace and upgrade the water‑distribution system along Mistletoe Lane and Victor Avenue. The contract includes the removal of existing 8‑inch water mains, installation of new 8‑inch PVC mains (over 4,300 ft), associated water services, fire hydrants, a variety of valves, and ancillary civil works such as trench shoring, traffic control, erosion‑control measures, and site signage. The work must be completed within a 90‑working‑day schedule, with strict limits on water‑main shutdown duration and liquidated‑damage provisions for schedule overruns.
• Replace > 4,300 ft of 8‑in. water main (PVC) and install 6‑in. PVC and 12‑in. DIP sections.
• Install 37 gate valves, 1 pressure‑reducing valve, fire‑hydrant assemblies, and numerous water‑service connections.
• Provide traffic‑control, trench shoring, construction‑area signage, erosion‑control, and a water‑main creek crossing (including non‑removable bollards).
• Complete all work within 90 working days; shutdowns limited to 4 hours with $1,000/hour liquidated‑damage penalty.
• Must post a 10 % bid bond and provide performance, payment, and maintenance bonds upon award.