The Department of the Air Force is conducting market research to identify qualified businesses capable of replacing a chilled water system at Buckley Space Force Base in Colorado. The project involves decommissioning and removing the existing chiller and two Computer Room Air Handlers (CRAHs), and installing a new Trane-series chiller system and two new CRAHs. The work must be done with zero downtime to the active server room. The project has strict physical and technical constraints, including a 12,000 lb pad weight limit and a narrow 34" x 82" pathway for maneuvering CRAHs into the server room.
Key requirements include:
• Providing temporary cooling to ensure server room temperatures remain within operational limits during the transition
• Decommissioning and removing the existing chiller and CRAHs
• Installing a new Trane-series chiller system and two new CRAHs
• Commissioning all new equipment and verifying proper system performance and integration into the existing base Energy Management Control System (EMCS)
• Complying with strict physical and technical constraints, including footprint and weight limits, power supply requirements, and governing standards.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.