The United States Air Force is seeking a contractor to replace the HVAC system at Building 285, Tinker Air Force Base, Oklahoma. The project involves repairing the HVAC system, including demolition and replacement of existing equipment, and ensuring that the new system meets the required environmental performance criteria. The contractor will be responsible for performing a complete HVAC load calculation for the entire building footprint, providing all necessary design deliverables, and ensuring that the new controls system integrates with the existing base-wide controls network. The project has a estimated value between $1,000,000 and $5,000,000 and is restricted to SB MAC BOA holders only.
Key aspects of the project include:
• Replacement of the existing HVAC system
• Demolition and removal of existing equipment
• Installation of new HVAC equipment, including a new packaged unit
• Modification of existing ductwork and controls infrastructure
• Integration with the existing base-wide controls network
• Compliance with UFC 3-410-01 and ASHRAE 62.1
• Provision of temporary heating during winter months to protect the building infrastructure
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.