Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›Level 2 EV Charger Installation

Victor Valley Transit Authority·California

Level 2 EV Charger Installation

Closes 8/6/2026$300k – $600kRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Victor Valley Transit Authority is seeking a design‑build contractor to add six Level 2 electric‑vehicle (EV) chargers to its main parking lot in Hesperia, CA. The work includes engineering design, permitting, electrical panel upgrades, conduit and wiring installation, concrete work, pavement striping, and full commissioning of the chargers, along with as‑built documentation and training. The contractor must also provide a metering or software solution for individual charger energy use reporting and must meet all applicable California and federal (Buy‑America, Davis‑Bacon) requirements. • Supply and install six identical Level 2 chargers (Leviton 041‑EVB32‑H18, 40 A, Type‑1 SAE J1772) with power‑monitoring capability. • Upgrade existing switchgear with a new 40 A breaker and a dedicated panelboard (weather‑proof if exterior). • Perform civil site work: concrete pads, trenching, re‑striping of parking spaces, and install wheel stops. • Deliver complete design‑build package, obtain all permits, provide testing/commissioning, as‑built drawings, O&M manuals, and training.

Attached files

Contact

Christine Plasting(Procurement Manager)

[email protected]

Key dates

Opened
6/23/2026
Questions due
7/24/2026
Pre-bid meeting
7/13/2026
Site visit
7/13/2026
Closes
8/6/2026
Projected award
8/1/2026
Duration
180 days

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
238210
Solicitation №
RFP 2026‑09

Budget estimate

$300,000 – $600,000

No budget ceiling is published, but based on typical costs for six Level 2 chargers, panel upgrades, concrete work, and permitting in California, a reasonable contract value likely falls between $300,000 and $600,000. The range accounts for equipment costs (~$150‑$200k), civil construction (~$80‑$150k), design/engineering fees, and contingency.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Maryland Department Of General Services·Maryland

Top match · 66%

Installing 10 Single-Port 48A Level 2 and 2 Level 3 80 kW DC Fast Chargers at Maryland Correctional Transportation Unit

Closes 11/9/2026Opened 10/17/2026

New York State Energy Research and Development Authority·New York

65% match

Charge Ready NY 2.0 Equipment and Network Qualification Process

Closes 12/31/2026Opened 4/8/2025

City of Long Beach·California

65% match

R-7282 Fleet Services EV Charging Depot

Closes 11/20/2026Opened 10/14/2026

Connecticut Energy & Environmental Protection·Connecticut

65% match

Electric Vehicle Charging Station Upgrades

Closes 11/13/2026Opened 10/23/2026

New York State Energy Research and Development Authority·New York

64% match

Charge Ready NY 2.0

Closes 12/31/2026Opened 7/8/2025

California Department of General Services·California

64% match

Project 13751. FTB EVSE. Contract 26-340236

Closes 11/30/2026Opened 10/19/2026

City of Tamarac·Florida

64% match

EV CHARGING STATION INFRASTRUCTURE- DC FAST CHARGING STATIONS

Closes 11/17/2026Opened 10/15/2026

NYS Rockland County·New York

63% match

ELECTRIC VEHICLE CHARGING INFRASTRUCTURE STUDY

Closes 11/6/2026Opened 9/22/2026

City of Cincinnati – Department of Transportation (DOTE)·Ohio

63% match

EV Charging Rec Centers PID 122816

Closes 11/13/2026Opened 10/27/2026

City of Cincinnati·Ohio

62% match

EV Charging Rec Centers PID 122816

Closes 11/6/2026Opened 10/19/2026

City of Cincinnati·Ohio

62% match

EV Charging Rec Centers PID 122816

Closes 11/6/2026Opened 10/16/2026

City of Cincinnati·Ohio

62% match

EV Charging Rec Centers PID 122816

Closes 11/13/2026Opened 10/16/2026

City of Pinole·California

62% match

Design Services for Electric Vehicle Charging Infrastructure for the City of Pinole

Closes 11/4/2026Opened 10/7/2026

California Department of State Hospitals·California

62% match

IFB 26-42015-000 Electric Vehicle Charging Stations Maintenance and Repair Services

Closes 11/6/2026Opened 10/21/2026

Lee County·Florida

61% match

Installation of Two ChargePoint Electric Bus Chargers

Closes 11/3/2026Opened 10/2/2026

Lee County·Florida

61% match

Installation of Two ChargePoint Electric Bus Chargers

Closes 11/3/2026Opened 10/2/2026

U.S. Department Of Defense·United States of America

61% match

CHARGER, BATTERY

Closes 11/17/2026Opened 8/19/2026

U.S. Department Of Defense·United States of America

60% match

61--CHARGER,BATTERY, IN REPAIR/MODIFICATION OF

Closes 11/9/2026Opened 10/8/2026

Lee County·Florida

60% match

Installation of Two ChargePoint Electric Bus Chargers

Closes 11/3/2026Opened 10/2/2026

U.S. Department Of Defense·United States of America

60% match

CHARGER,BATTERY

Closes 11/20/2026Opened 10/21/2026

Massachusetts Department of Transportation·Massachusetts

60% match

613689 CAMBRIDGE FAP No. HPP/STP-003E(014)X Neighborhood Electric Vehicle Charging Infrastructure

Closes 11/10/2026Opened 9/14/2026

Port of Long Beach·California

60% match

HD-S3203 HARBOR FLEET ZERO EMISSIONS INFRASTRUCTURE

Closes 11/17/2026Opened 10/8/2026

Pennsylvania Philadelphia Regional Port Authority·Pennsylvania

60% match

RFP for EV Forklifts and Charging Stations

Closes 11/17/2026Opened 10/22/2026

California Department of Forestry and Fire Protection·California

59% match

IFB 9CA07882 - Underground Electrical Power Infrastructure Installation

Closes 11/18/2026Opened 9/16/2026

Lee County·Florida

59% match

Installation of Two ChargePoint Electric Bus Chargers

Closes 11/3/2026Opened 10/2/2026