Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›Phase 2A - Arden Service Area Pipe and Meter Installation…

Awarded contract·County of Sacramento - Sacramento County Water Agency·California

Phase 2A - Arden Service Area Pipe and Meter Installation Project

Won by Flowline Contractors, Inc.$8.9MSingle Award
Contract source

Awarded vendors

  • Flowline Contractors, Inc.

Description

The Phase 2A - Arden Service Area Pipe and Meter Installation Project involves the installation of approximately 17,500 feet of 8-inch and 12-inch ductile iron pipeline, as well as 254 metered service connections. The project includes work on private property and requires the vendor to furnish all labor, materials, and equipment necessary for the construction of the pipeline and meter installations. The contract includes a base bid and two alternative bids for residential road slurry seal pavement restoration and 2-inch overlay pavement restoration. The vendor is required to submit a bid proposal, certification documents, and a list of subcontractors. The contract is subject to the California Public Contract Code and includes provisions for affirmative action, equal employment opportunity, and non-collusion. • The project requires the installation of 8-inch and 12-inch ductile iron pipeline. • The project includes 254 metered service connections. • The vendor must furnish all labor, materials, and equipment necessary for the construction of the pipeline and meter installations. • The contract includes a base bid and two alternative bids for residential road slurry seal pavement restoration and 2-inch overlay pavement restoration. • The vendor is required to submit a bid proposal, certification documents, and a list of subcontractors. • The contract is subject to the California Public Contract Code and includes provisions for affirmative action, equal employment opportunity, and non-collusion.

Attached files

Key dates

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237110
Solicitation №
4436

Contract value

$8,874,329

The estimated value of this contract is $8,874,329.00, based on the total bid amount submitted by Flowline Contractors, Inc. This amount includes the base bid and the two alternative bids for residential road slurry seal pavement restoration and 2-inch overlay pavement restoration. The contract documents include a detailed breakdown of the bid items and prices, which supports the use of this estimated value.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Pasadena·California

Top match · 72%

Advanced Metering Infrastructure (AMI) System and Installation Services

Closes 12/1/2026Opened 10/13/2026

City of Aumsville·Oregon

70% match

Automatic Metering Infrastructure Supply & Installation

Closes 11/17/2026Opened 10/20/2026

City of Ankeny·Iowa

69% match

Westlawn Place Area Utility Improvements - Phase 2A

Closes 11/10/2026Opened 10/21/2026

City of Boca Raton·Florida

69% match

Installation and/or Replacement of Potable and, or Reclaimed Water Meters with AMI Transponders

Closes 11/23/2026Opened 10/20/2026

City of Des Moines - Iowa·Iowa

69% match

WRA Joint Trunk – Phase 14, Segment 3

Closes 12/1/2026Opened 10/21/2026

City of Punta Gorda·Florida

69% match

SVC-AMI/1626 - Advanced Metering Infrastructure (AMI)

Closes 11/20/2026Opened 9/25/2026

City of Daytona Beach·Florida

69% match

2701TB - Tomoka Farms Road & Bellevue Avenue Watermain Realignment Project

Closes 11/5/2026Opened 10/1/2026

City of Charlotte·North Carolina

68% match

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

City of Boca Raton·Florida

68% match

Installation and/or Replacement of Potable and, or Reclaimed Water Meters with AMI Transponders

Closes 11/23/2026Opened 10/20/2026

Town of Upton·Wyoming

68% match

Phase 2.2 - Wyoming & Montana Avenues, Improvements

Closes 11/6/2026Opened 10/23/2026

Western Virginia Water Authority·Virginia

68% match

INVITATION TO BID: BRANDON AVENUE WATER DISTRIBUTION SYSTEM IMPROVEMENTS – PHASE 1

Closes 11/4/2026Opened 10/7/2026

Atlantic County Utilities Authority, NJ·New Jersey

68% match

Atlantic City Flow Meter Replacement Project

Closes 11/4/2026Opened 10/6/2026

U.S. Department Of Defense·Missouri

68% match

MSD Infrastructure Repairs Phase 2

Closes 6/23/2027Opened 6/23/2026

LA County Public Works·California

67% match

BRC0000682 - Agricultural Commissioner/Weights and Measures South Gate Meter Pit Repurpose Project

Closes 11/24/2026Opened 10/21/2026

Western Virginia Water Authority·Virginia

67% match

INVITATION TO BID: BRANDON AVENUE WATER DISTRIBUTION SYSTEM IMPROVEMENTS – PHASE 1

Closes 11/4/2026Opened 10/7/2026

City of Rockford·Illinois

67% match

LEAD SERVICE LINE REPLACEMENT PHASE 11H

Closes 11/2/2026Opened 9/14/2026

Los Angeles County Public Works·California

67% match

Removal of existing meter pit and office structure and replacement with prefabricated office and ADA‑compliant restroom building

Closes 11/24/2026Opened 10/26/2026

City of St. Charles·Illinois

67% match

Advanced Metering Infrastructure (AMI)

Closes 12/3/2026Opened 9/30/2026

City of Riverside·California

66% match

PARK AVENUE WATER TRANSMISSION MAIN REPLACEMENT

Closes 12/3/2026Opened 10/30/2026

City of Bedford, TX·Texas

66% match

Water Meter Installations

Closes 11/12/2026Opened 10/9/2026

City of Rockford·Illinois

66% match

LEAD SERVICE LINE REPLACEMENT PHASE 11I

Closes 11/2/2026Opened 9/14/2026

City of Beaumont·California

66% match

IFB 26-21 ONGOING PIPELINE REPLACEMENT (CIP WW26-12)

Closes 12/1/2026Opened 10/22/2026

City of Cincinnati - Purchasing Division·Ohio

66% match

De Votie Avenue Sewer Replacement - Phase 2A

Closes 11/25/2026Opened 10/28/2026

Town of Eatonville·Florida

66% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

City of Salina·Kansas

66% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/3/2026