The Phase 2A - Arden Service Area Pipe and Meter Installation Project involves the installation of approximately 17,500 feet of 8-inch and 12-inch ductile iron pipeline, as well as 254 metered service connections. The project includes work on private property and requires the vendor to furnish all labor, materials, and equipment necessary for the construction of the pipeline and meter installations. The contract includes a base bid and two alternative bids for residential road slurry seal pavement restoration and 2-inch overlay pavement restoration. The vendor is required to submit a bid proposal, certification documents, and a list of subcontractors. The contract is subject to the California Public Contract Code and includes provisions for affirmative action, equal employment opportunity, and non-collusion.
• The project requires the installation of 8-inch and 12-inch ductile iron pipeline.
• The project includes 254 metered service connections.
• The vendor must furnish all labor, materials, and equipment necessary for the construction of the pipeline and meter installations.
• The contract includes a base bid and two alternative bids for residential road slurry seal pavement restoration and 2-inch overlay pavement restoration.
• The vendor is required to submit a bid proposal, certification documents, and a list of subcontractors.
• The contract is subject to the California Public Contract Code and includes provisions for affirmative action, equal employment opportunity, and non-collusion.