Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›Phase 2B – Arden Service Area Pipe and Meter Installation…

Awarded contract·County of Sacramento - Construction·California

Phase 2B – Arden Service Area Pipe and Meter Installation Project

Won by Flowline Contractors Inc +3 more$11MMultiple Award
Contract source

Awarded vendors

  • Flowline Contractors Inc
  • McGuire Hester
  • Sanco Pipelines Inc
  • Teichert Construction

Description

The contract is for the construction of water mains, fire hydrants, backflow preventers, appurtenances, and tie-ins in the Arden Service Area. The engineer's estimate for the project is $11,000,000. The contract was awarded to multiple vendors, but was later rejected and will be re-bid. The project includes the installation of new metered services and the reconnection of existing metered services to the new water mains. The contractor must have a Class A General Engineering or Class C-34 Pipeline Contractor license. • The project includes the construction of 8-, 10-, and 12-inch diameter water mains. • The project includes the installation of fire hydrants, backflow preventers, appurtenances, and tie-ins. • The project includes the abandonment of existing services and mains. • The project includes the installation of new metered services and the reconnection of existing metered services to the new water mains. • The contractor must have a Class A General Engineering or Class C-34 Pipeline Contractor license.

Attached files

Key dates

Last updated

Details

Award type
Multiple Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237110
Solicitation №
4507

Contract value

$11,000,000

The estimated value of the contract is $11,000,000, as stated in the engineer's estimate. This value is based on the scope of work, which includes the construction of water mains, fire hydrants, backflow preventers, appurtenances, and tie-ins. The value may vary depending on the actual costs of materials, labor, and equipment.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Pasadena·California

Top match · 71%

Advanced Metering Infrastructure (AMI) System and Installation Services

Closes 12/1/2026Opened 10/13/2026

City of Aumsville·Oregon

69% match

Automatic Metering Infrastructure Supply & Installation

Closes 11/17/2026Opened 10/20/2026

City of Boca Raton·Florida

69% match

Installation and/or Replacement of Potable and, or Reclaimed Water Meters with AMI Transponders

Closes 11/23/2026Opened 10/20/2026

City of Des Moines - Iowa·Iowa

68% match

WRA Joint Trunk – Phase 14, Segment 3

Closes 12/1/2026Opened 10/21/2026

City of Punta Gorda·Florida

68% match

SVC-AMI/1626 - Advanced Metering Infrastructure (AMI)

Closes 11/20/2026Opened 9/25/2026

City of Daytona Beach·Florida

68% match

2701TB - Tomoka Farms Road & Bellevue Avenue Watermain Realignment Project

Closes 11/5/2026Opened 10/1/2026

City of Boca Raton·Florida

68% match

Installation and/or Replacement of Potable and, or Reclaimed Water Meters with AMI Transponders

Closes 11/23/2026Opened 10/20/2026

Town of Upton·Wyoming

68% match

Phase 2.2 - Wyoming & Montana Avenues, Improvements

Closes 11/6/2026Opened 10/23/2026

City of Ankeny·Iowa

68% match

Westlawn Place Area Utility Improvements - Phase 2A

Closes 11/10/2026Opened 10/21/2026

Atlantic County Utilities Authority, NJ·New Jersey

68% match

Atlantic City Flow Meter Replacement Project

Closes 11/4/2026Opened 10/6/2026

Western Virginia Water Authority·Virginia

68% match

INVITATION TO BID: BRANDON AVENUE WATER DISTRIBUTION SYSTEM IMPROVEMENTS – PHASE 1

Closes 11/4/2026Opened 10/7/2026

City of Charlotte·North Carolina

68% match

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

City of Beaumont·California

67% match

IFB 26-21 ONGOING PIPELINE REPLACEMENT (CIP WW26-12)

Closes 12/1/2026Opened 10/22/2026

U.S. Department Of Defense·Missouri

67% match

MSD Infrastructure Repairs Phase 2

Closes 6/23/2027Opened 6/23/2026

City of Riverside·California

67% match

PARK AVENUE WATER TRANSMISSION MAIN REPLACEMENT

Closes 12/3/2026Opened 10/30/2026

Western Virginia Water Authority·Virginia

67% match

INVITATION TO BID: BRANDON AVENUE WATER DISTRIBUTION SYSTEM IMPROVEMENTS – PHASE 1

Closes 11/4/2026Opened 10/7/2026

LA County Public Works·California

67% match

BRC0000682 - Agricultural Commissioner/Weights and Measures South Gate Meter Pit Repurpose Project

Closes 11/24/2026Opened 10/21/2026

City of Bedford, TX·Texas

67% match

Water Meter Installations

Closes 11/12/2026Opened 10/9/2026

Ohio City of Westerville·Ohio

66% match

Brooksedge Area Mobility Improvements, PH 2 & 3

Closes 11/4/2026Opened 10/7/2026

City of Winnebago·Minnesota

66% match

Winnebago, City of Water Meter Replacement BMI Project No. 26X146003

Closes 11/18/2026Opened 10/25/2026

City of Rockford·Illinois

66% match

LEAD SERVICE LINE REPLACEMENT PHASE 11H

Closes 11/2/2026Opened 9/14/2026

City of Rockford·Illinois

66% match

LEAD SERVICE LINE REPLACEMENT PHASE 11I

Closes 11/2/2026Opened 9/14/2026

Town of Eatonville·Florida

66% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

City of St. Charles·Illinois

66% match

Advanced Metering Infrastructure (AMI)

Closes 12/3/2026Opened 9/30/2026

City of Salina·Kansas

66% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/3/2026