Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Pennsylvania guidePennsylvania Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Pennsylvania
  4. ›Water and Wastewater
  5. ›BR-Water Lines-Water System Improvements

Awarded contract·Pennsylvania State University-Main Campus·Pennsylvania

BR-Water Lines-Water System Improvements

$5MSingle Award
Contract source

Description

This project involves the complete replacement of water distribution infrastructure on Penn State’s Beaver campus, plus the construction of a new booster pump station equipped with a pump skid and a backup generator. The scope includes removing existing waterlines, installing new service connections, and building a standalone pump‑house structure to maintain adequate water pressure across the campus facilities. • Replace all campus waterlines and associated service connections. • Construct a new, fully equipped booster pump station building with backup power. • Provide a pump skid and integrate a standby generator for uninterrupted service. The project is marked as “Appointment Complete,” indicating internal approvals are finished, but vendor selection details are not disclosed.

Attached files

The award documents live at the source — open the contract source above to download them.

Key dates

Last updated

Details

Award type
Single Award
Industry
Water Management and Sanitation
NAICS
237110
Solicitation №
00-08092.00

Contract value

$5,000,000

No explicit dollar amount is given. Replacing campus‑wide waterlines and constructing a new booster pump station with a generator typically ranges from several million to low‑tens‑of‑millions of dollars, depending on length of pipe, site conditions, and equipment capacity. For a mid‑size university campus, a reasonable ballpark is between $3 million and $7 million. Taking a midpoint of roughly $5 million reflects typical costs for materials, excavation, pipe installation, pump equipment, and building construction, while also allowing for engineering design and contingency.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Charlotte·North Carolina

Top match · 72%

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

City of Holly Grove·Arkansas

72% match

Water System Improvements – Waterline Replacement

Closes 11/18/2026Opened 10/25/2026

City of Alexandria·Louisiana

70% match

City of Alexandria - Water System Improvements - Hwy 1 South Booster Station, Ground Storage Tank & Water Main

Closes 11/3/2026Opened 10/2/2026

City of Conway·South Carolina

70% match

Highway 905 Water Line Upgrade

Closes 12/3/2026Opened 10/30/2026

Catawba Regional Council of Governments·South Carolina

70% match

Shannon Street Waterline Project

Closes 11/5/2026Opened 9/30/2026

City of Fredonia·Kansas

69% match

Distribution System Improvements - Fredonia, KS

Closes 11/12/2026Opened 10/29/2026

U.S. Department Of The Interior·California

69% match

Y--LB Lateral Water Line and Facilities Replacement for Wastewater System

Closes 11/11/2026Opened 10/27/2026

City of Litchfield·Illinois

69% match

Water Distribution Improvements Phases 1 & 2 - Litchfield, IL

Closes 11/5/2026Opened 10/2/2026

City of Lake City and City of Bellechester·Minnesota

69% match

Lake City & Bellechester Lead Service Line Replacement Project

Closes 12/8/2026Opened 10/16/2026

NYS Alden, Town of·New York

68% match

Townline Water District

Closes 11/4/2026Opened 10/9/2026

St. Helena Parish Police Jury·Louisiana

68% match

2026 CWEF Water System Improvements

Closes 11/5/2026Opened 10/9/2026

Washington Suburban Sanitary Commission, MD·Maryland

68% match

Water Engineering Services (BOA)

Closes 11/18/2026Opened 10/14/2026

Western Virginia Water Authority·Virginia

68% match

INVITATION TO BID: BRANDON AVENUE WATER DISTRIBUTION SYSTEM IMPROVEMENTS – PHASE 1

Closes 11/4/2026Opened 10/7/2026

Mississippi

68% match

2020 Water Distribution System Additions

Closes 11/4/2026Opened 10/30/2026

City of Farmers Branch·Texas

68% match

Waterline Replacement Engineering Design

Closes 11/3/2026Opened 10/1/2026

U.S. Department Of The Interior·New Mexico

67% match

C--BGNDRF PIPING UPGRADES

Closes 11/13/2026Opened 10/7/2026

Riverton City·Utah

67% match

CC26-475 Main Water Tank Drainline Upgrade Project

Closes 11/17/2026Opened 10/30/2026

U.S. Department Of Agriculture·Utah

67% match

Ross Springs Waterline Replacement

Closes 11/21/2026Opened 10/22/2026

CPPJ- Special Service Districts·Louisiana

67% match

Nelson Road Waterline Expansion Project

Closes 11/17/2026Opened 10/20/2026

City of Lavaca·Arkansas

67% match

West Birch Street Water System Improvements

Closes 11/5/2026Opened 10/11/2026

Inland Empire Utilities Agency·California

67% match

Brine Line Master Service

Closes 11/5/2026Opened 10/5/2026

Louisiana Jefferson Parish Purchasing Department·Louisiana

67% match

JEFFERSON PARISH WATERLINE IMPROVEMENTS SOUTH NEW ORLEANS SUBDIVISIO

Closes 11/17/2026Opened 10/7/2026

Santa Maria-Bonita School District·California

67% match

BONITA SCHOOL DRINKING WATER IMPROVEMENTS

Closes 12/14/2026Opened 10/30/2026

Terrebonne Parish Consolidated Waterworks District No. 1·Louisiana

66% match

Boudreaux Canal Crossing Waterline Replacement TPCW Project No. H.002244

Closes 11/10/2026Opened 10/13/2026

Alaska Department of Environmental Conservation·Alaska

66% match

University of Alaska Southeast Water Line Improvements Categorical Exclusion Determination

Rolling / TBD closeOpened 10/9/2026