Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Engineering Services
  5. ›Surface Water Discharge Elimination Progressive Design-Build

Awarded contract·City of Fort Myers·Florida

Surface Water Discharge Elimination Progressive Design-Build

Won by CDM Smith Inc.$5MSingle Award
Contract source

Awarded vendors

  • CDM Smith Inc.

Description

The City of Fort Myers has awarded a contract for the Surface Water Discharge Elimination Progressive Design-Build project. The contract was awarded to CDM Smith Inc. The project aims to eliminate surface water discharge, but the exact scope of work and details are not provided in the given text. Key aspects of the contract include the duration, which is not specified, and the budget, which is also not provided. The contract is a progressive design-build project, indicating a collaborative approach between the contractor and the city. • The contract is for a progressive design-build project. • The project aims to eliminate surface water discharge. • The contract was awarded to CDM Smith Inc. • The duration and budget of the contract are not specified. • The contract is a public contract, and the city has made the contract documents available.

Attached files

The award documents live at the source — open the contract source above to download them.

Key dates

Starts
12/3/2023

Last updated

Details

Award type
Single Award
Industry
Engineering Services
NAICS
541620
Solicitation №
0058-23-CDM

Contract value

$5,000,000

The contract value is not explicitly stated in the provided text. However, based on the project description, it can be estimated that the contract value is likely to be in the range of several million dollars, considering the scope of the project involves eliminating surface water discharge, which requires significant engineering and construction work. The exact value depends on various factors such as the location, technology used, and the scale of the project.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

California Department of Water Resources·California

Top match · 69%

RFQ/P Progressive Design-Build Project Reference No. DB-2026-01 - Kane Spring Project

Closes 12/4/2026Opened 8/27/2026

Oregon Clackamas County·Oregon

68% match

RFP 2026-80 Sandy River Force Main River Crossing Project â?? Progressive Design-Build

Closes 12/3/2026Opened 10/29/2026

Sun 'n Lake Improvement District·Florida

68% match

Wastewater Treatment Plant Progressive Design-Build Services

Closes 11/20/2026Opened 10/19/2026

City of Cincinnati·Ohio

68% match

LMWWTP High-Rate Treatment Facility Progressive Design Build

Closes 11/10/2026Opened 9/16/2026

Metropolitan Sewer District of Greater Cincinnati·Ohio

67% match

LMWWTP High-Rate Treatment Facility Progressive Design Build

Closes 11/10/2026Opened 10/28/2026

Metropolitan Sewer District of Greater Cincinnati·Ohio

67% match

LMWWTP High-Rate Treatment Facility Progressive Design Build

Closes 11/4/2026Opened 10/21/2026

Palm Beach County Water Utilities Department·Florida

67% match

WRWWTF Electrical Building Progressive Design-Build

Closes 11/12/2026Opened 9/23/2026

Palm Beach County Water Utilities Department·Florida

67% match

WRWWTF Electrical Building Progressive Design-Build

Closes 11/12/2026Opened 10/1/2026

Palm Beach County Water Utilities Department·Florida

66% match

WRWWTF Electrical Building Progressive Design-Build

Closes 11/12/2026Opened 10/16/2026

City of Virginia Beach·Virginia

66% match

COVB-26-101639-2 - Central Resort District Drainage Improvement Phase 1 Design-Build

Closes 11/5/2026Opened 10/23/2026

City of Cincinnati·Ohio

66% match

LMWWTP High-Rate Treatment Facility Progressive Design Build

Closes 11/4/2026Opened 9/16/2026

Metropolitan Sewer District of Greater Cincinnati·Ohio

66% match

LMWWTP High-Rate Treatment Facility Progressive Design Build

Closes 11/4/2026Opened 10/14/2026

Covington Municipality·Rhode Island

66% match

088-26-GREEN INFRASTUCTURE STORMWATER PROJECT DESIGN

Closes 11/2/2026Opened 11/2/2026

City of Sunnyvale Procurement Bids and RFPs·California

65% match

Cleanwater Center and Perimeter Wall Project

Closes 11/11/2026Opened 10/9/2026

Johnson County Wastewater·Kansas

65% match

Notice - Progressive Design Build (PDB) Services for the Brush Creek Pump Station Improvements

Rolling / TBD closeOpened 11/4/2026

City of Farmers Branch·Texas

65% match

Waterline Replacement Engineering Design

Closes 11/3/2026Opened 10/1/2026

California Department of Water Resources·California

65% match

Progressive Design-Build Independent Cost Estimator Services for the Kane Spring Project

Closes 11/19/2026Opened 10/1/2026

City and County of San Francisco·California

64% match

DPW | PORT Preconstruction Engineering Design

Closes 11/13/2026Opened 10/2/2026

Alaska Department of Environmental Conservation – Village Safe Water Program·Alaska

64% match

Notice of Categorical Exclusion Determination - Marshall Phase 9 Water and Sewer Improvements

Rolling / TBD closeOpened 9/25/2026

Maryland Department of Transportation·Maryland

64% match

MD 249 (Piney Point Road) from Thomas Road to Stark Drive -Drainage Improvements -Design-Build

Closes 11/17/2026Opened 9/29/2026

U.S. Department Of The Interior·California

64% match

FWS - Pixley NWR Water Recirculation Design-Build

Closes 11/30/2026Opened 10/30/2026

Maryland-National Capital Park and Planning Commission·Maryland

64% match

Cosca Regional Park Boat House Replacement, Site Accessibility, and Stormwater Improvements Design Build

Closes 1/6/2027Opened 10/28/2026

City of Bellevue·Washington

64% match

2027 Phase 1 Water Main Replacement

Closes 11/12/2026Opened 10/22/2026

City of Charlotte·North Carolina

64% match

Collective AG Storm Water Drainage Improvement Project

Rolling / TBD closeOpened 3/15/2026

Fort Pierce Utilities Authority·Florida

64% match

Water & Wastewater Systems Continuing Design-Build Services

Closes 11/2/2026Opened 10/6/2026