The City and County of Denver’s Department of Transportation & Infrastructure awarded a two‑year (extended to three‑year in final award) as‑needed contract for emergency wastewater repair work across the city’s wastewater infrastructure. The scope includes excavation, concrete work, paving, lift‑station and pump‑station repairs, pipe inspection, hydro‑excavation, asbestos handling, and a broad set of civil‑construction activities required to restore or maintain ponds, outfalls, sanitary and storm conduits, and related water‑quality facilities. The contract is structured around hourly labor rates, equipment usage, and material allowances, with a maximum ceiling of $4.28 M and a firm award amount of $4,191,995.
• Emergency, on‑call repairs for wastewater facilities (ponds, outfalls, lift/pump stations).
• Comprehensive civil‑construction tasks: excavation, concrete paving, curb & gutter, sidewalk, and retaining‑wall work.
• Specialized services: CCTV pipe inspection, hydro‑excavation, asbestos remediation, environmental sampling, and engineering consulting.
• Labor‑hour based pricing with allowances for equipment, water‑treatment gear, and material purchases; MWBE participation goal of 9 %.